Oil & GasIPM · Central Project +14.3% overrun#701341

Multi-product Pipeline from Krishnapatnam Coastal Installation to the proposed Installation at Hyderabad [Malkapur]

Ministry of Petroleum & Natural GasAndhra Pradesh
Revised Cost: ₹2208 CrUtilization: 70.3%Overrun: +₹276 Cr

Original Cost

₹1932 Cr

Baseline estimate

+14% overrun

Revised Cost

₹2208 Cr

Latest approved cost

Expenditure

₹1552 Cr

Spent to date

Utilization

70.3%

Of revised budget

Escalated

Cost Status

+14.3%

+₹276 Cr increase

Remaining

₹656 Cr

Budget left

Budget Utilization

70.3%
0%25%50%75%100%

Spent

₹1552 Cr

Remaining

₹656 Cr

Total

₹2208 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹1932 Cr

Revised Cost

₹2208 Cr

Increase

+₹276 Cr

Escalation

+14.3%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/03/2025

Revised Completion

31/08/2025

Completed

Project Details

Project Code701341
SectorOil & Gas
MinistryMinistry of Petroleum & Natural Gas
StateAndhra Pradesh
Data Month2025-07

Financial Summary

Original Cost₹1932 Cr
Revised Cost₹2208 Cr
Expenditure₹1552 Cr
Original End Date31/03/2025
Revised Date31/08/2025

Project Intelligence

Cost has increased by ₹276 Cr (14.3%) from the original estimate of ₹1932 Cr.

Expenditure stands at ₹1552 Cr, which is 70.3% of the revised project cost.

Remaining budget: ₹656 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Oil & Gas. Ministry: Ministry of Petroleum & Natural Gas.

Multi-product Pipeline from Krishnapatnam Coastal Installation to the proposed Installation at Hyderabad [Malkapur] is a centrally-funded infrastructure project under Ministry of Petroleum & Natural Gas, in the Oil & Gas sector. The original approved cost is ₹1932.00 Cr, later revised to ₹2208.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Multi-product Pipeline from Krishnapatnam Coastal Installation to the proposed I"?
Multi-product Pipeline from Krishnapatnam Coastal Installation to the proposed Installation at Hyderabad [Malkapur] is a centrally-funded infrastructure project under the Ministry of Petroleum & Natural Gas, tracked through the Investment Project Monitoring (IPM) system. Sector: Oil & Gas. State: Andhra Pradesh. Original cost: ₹1932 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹1932 Cr and has been revised to ₹2208 Cr — a cost overrun of +14.3%. Expenditure to date: ₹1552 Cr (70.3% of revised cost). Data as of 2025-07.
QWhich ministry is responsible for this project?
Multi-product Pipeline from Krishnapatnam Coastal Installati is under the Ministry of Petroleum & Natural Gas in the Oil & Gas sector. Project code: 701341. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Multi-product Pipeline from Krishnapatnam Coastal Installati is one of several Bihar projects tracked under the Oil & Gas sector on the IPM system.