Multi-product Pipeline from Krishnapatnam Coastal Installation to the proposed Installation at Hyderabad [Malkapur]
Original Cost
₹1932 Cr
Baseline estimate
Revised Cost
₹2208 Cr
Latest approved cost
Expenditure
₹1552 Cr
Spent to date
Utilization
70.3%
Of revised budget
Cost Status
+14.3%
+₹276 Cr increase
Remaining
₹656 Cr
Budget left
Budget Utilization
70.3%Spent
₹1552 Cr
Remaining
₹656 Cr
Total
₹2208 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1932 Cr
Revised Cost
₹2208 Cr
Increase
+₹276 Cr
Escalation
+14.3%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/03/2025
Revised Completion
31/08/2025
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹276 Cr (14.3%) from the original estimate of ₹1932 Cr.
Expenditure stands at ₹1552 Cr, which is 70.3% of the revised project cost.
Remaining budget: ₹656 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Oil & Gas. Ministry: Ministry of Petroleum & Natural Gas.
Multi-product Pipeline from Krishnapatnam Coastal Installation to the proposed Installation at Hyderabad [Malkapur] is a centrally-funded infrastructure project under Ministry of Petroleum & Natural Gas, in the Oil & Gas sector. The original approved cost is ₹1932.00 Cr, later revised to ₹2208.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Multi-product Pipeline from Krishnapatnam Coastal Installation to the proposed I"?
- Multi-product Pipeline from Krishnapatnam Coastal Installation to the proposed Installation at Hyderabad [Malkapur] is a centrally-funded infrastructure project under the Ministry of Petroleum & Natural Gas, tracked through the Investment Project Monitoring (IPM) system. Sector: Oil & Gas. State: Andhra Pradesh. Original cost: ₹1932 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1932 Cr and has been revised to ₹2208 Cr — a cost overrun of +14.3%. Expenditure to date: ₹1552 Cr (70.3% of revised cost). Data as of 2025-07.
- QWhich ministry is responsible for this project?
- Multi-product Pipeline from Krishnapatnam Coastal Installati is under the Ministry of Petroleum & Natural Gas in the Oil & Gas sector. Project code: 701341. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Multi-product Pipeline from Krishnapatnam Coastal Installati is one of several Bihar projects tracked under the Oil & Gas sector on the IPM system.