Original Cost
₹958 Cr
Baseline estimate
Revised Cost
₹958 Cr
Latest approved cost
Expenditure
₹215 Cr
Spent to date
Utilization
22.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹743 Cr
Budget left
Budget Utilization
22.4%Spent
₹215 Cr
Remaining
₹743 Cr
Total
₹958 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
15/01/2028
Revised Completion
15/01/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹958 Cr — no cost escalation recorded.
Expenditure stands at ₹215 Cr, which is 22.4% of the revised project cost.
Remaining budget: ₹743 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
lmprovement to 4-Lane with Paved Shoulder from existing km 260000 Design Ch.4560 km to existing km Ch.233000 D. Ch.24560 of Silchar near Nutan Dayapur village - Budha Nagar Section Length-20.00 Km of NH-37 under Package Silchar-Jiribam Pkg-1 in the state of Assam on HAM Mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹958.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "lmprovement to 4-Lane with Paved Shoulder from existing km 260000 Design Ch.4560"?
- lmprovement to 4-Lane with Paved Shoulder from existing km 260000 Design Ch.4560 km to existing km Ch.233000 D. Ch.24560 of Silchar near Nutan Dayapur village - Budha Nagar Section Length-20.00 Km of NH-37 under Package Silchar-Jiribam Pkg-1 in the state of Assam on HAM Mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹958 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹958 Cr has not been significantly revised. Expenditure: ₹215 Cr (22.4% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- lmprovement to 4-Lane with Paved Shoulder from existing km 2 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618331. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. lmprovement to 4-Lane with Paved Shoulder from existing km 2 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.