Energy StorageIPM · Central Project#400043

Laying of POL Pipelines in Common Corridor for proposed grass root terminal at Vallur [Chennai]

Ministry of Petroleum & Natural GasTamil Nadu
Revised Cost: ₹829 CrUtilization: 46.9%

Original Cost

₹829 Cr

Baseline estimate

On budget

Revised Cost

₹829 Cr

Latest approved cost

Expenditure

₹389 Cr

Spent to date

Utilization

46.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹440 Cr

Budget left

Budget Utilization

46.9%
0%25%50%75%100%

Spent

₹389 Cr

Remaining

₹440 Cr

Total

₹829 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/05/2026

Revised Completion

31/03/2027

Completed

Project Details

Project Code400043
SectorEnergy Storage
MinistryMinistry of Petroleum & Natural Gas
StateTamil Nadu
Data Month2026-08

Financial Summary

Original Cost₹829 Cr
Revised Cost₹829 Cr
Expenditure₹389 Cr
Original End Date31/05/2026
Revised Date31/03/2027

Project Intelligence

Project is within original budget of ₹829 Cr — no cost escalation recorded.

Expenditure stands at ₹389 Cr, which is 46.9% of the revised project cost.

Remaining budget: ₹440 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Energy Storage. Ministry: Ministry of Petroleum & Natural Gas.

Laying of POL Pipelines in Common Corridor for proposed grass root terminal at Vallur [Chennai] is a centrally-funded infrastructure project under Ministry of Petroleum & Natural Gas, in the Energy Storage sector. The original approved cost is ₹829.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Laying of POL Pipelines in Common Corridor for proposed grass root terminal at V"?
Laying of POL Pipelines in Common Corridor for proposed grass root terminal at Vallur [Chennai] is a centrally-funded infrastructure project under the Ministry of Petroleum & Natural Gas, tracked through the Investment Project Monitoring (IPM) system. Sector: Energy Storage. State: Tamil Nadu. Original cost: ₹829 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹829 Cr has not been significantly revised. Expenditure: ₹389 Cr (46.9% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Laying of POL Pipelines in Common Corridor for proposed gras is under the Ministry of Petroleum & Natural Gas in the Energy Storage sector. Project code: 400043. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Laying of POL Pipelines in Common Corridor for proposed gras is one of several Bihar projects tracked under the Energy Storage sector on the IPM system.