Roads & HighwaysIPM · Central Project#618101

Kondamodu to Perecherla Section Design Ch. Km 000 to Km 49917 of NH-167AG to to 4LPS

Ministry of Road Transport & HighwaysAndhra Pradesh
Revised Cost: ₹882 CrUtilization: 48.8%

Original Cost

₹882 Cr

Baseline estimate

On budget

Revised Cost

₹882 Cr

Latest approved cost

Expenditure

₹431 Cr

Spent to date

Utilization

48.8%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹451 Cr

Budget left

Budget Utilization

48.8%
0%25%50%75%100%

Spent

₹431 Cr

Remaining

₹451 Cr

Total

₹882 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

19/04/2027

Revised Completion

19/04/2027

Completed

Project Details

Project Code618101
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAndhra Pradesh
Data Month2026-08

Financial Summary

Original Cost₹882 Cr
Revised Cost₹882 Cr
Expenditure₹431 Cr
Original End Date19/04/2027
Revised Date19/04/2027

Project Intelligence

Project is within original budget of ₹882 Cr — no cost escalation recorded.

Expenditure stands at ₹431 Cr, which is 48.8% of the revised project cost.

Remaining budget: ₹451 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Kondamodu to Perecherla Section Design Ch. Km 000 to Km 49917 of NH-167AG to to 4LPS is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹882.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Kondamodu to Perecherla Section Design Ch. Km 000 to Km 49917 of NH-167AG to to "?
Kondamodu to Perecherla Section Design Ch. Km 000 to Km 49917 of NH-167AG to to 4LPS is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹882 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹882 Cr has not been significantly revised. Expenditure: ₹431 Cr (48.8% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Kondamodu to Perecherla Section Design Ch. Km 000 to Km 4991 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618101. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Kondamodu to Perecherla Section Design Ch. Km 000 to Km 4991 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.