Khammam-Devarapalle Pkg V [4L Access Controlled Greenfield from Gurvaygudem village to Devarapalle village Design Chainage 132664 to 162126
Original Cost
₹712 Cr
Baseline estimate
Revised Cost
₹926 Cr
Latest approved cost
Expenditure
₹567 Cr
Spent to date
Utilization
61.2%
Of revised budget
Cost Status
+30.1%
+₹214 Cr increase
Remaining
₹360 Cr
Budget left
Budget Utilization
61.2%Spent
₹567 Cr
Remaining
₹360 Cr
Total
₹926 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹712 Cr
Revised Cost
₹926 Cr
Increase
+₹214 Cr
Escalation
+30.1%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
25/09/2024
Revised Completion
31/07/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹214 Cr (30.1%) from the original estimate of ₹712 Cr.
Expenditure stands at ₹567 Cr, which is 61.2% of the revised project cost.
Remaining budget: ₹360 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Khammam-Devarapalle Pkg V [4L Access Controlled Greenfield from Gurvaygudem village to Devarapalle village Design Chainage 132664 to 162126 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹712.00 Cr, later revised to ₹926.48 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Khammam-Devarapalle Pkg V [4L Access Controlled Greenfield from Gurvaygudem vill"?
- Khammam-Devarapalle Pkg V [4L Access Controlled Greenfield from Gurvaygudem village to Devarapalle village Design Chainage 132664 to 162126 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹712 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹712 Cr and has been revised to ₹926 Cr — a cost overrun of +30.1%. Expenditure to date: ₹567 Cr (61.2% of revised cost). Data as of 2026-06.
- QWhich ministry is responsible for this project?
- Khammam-Devarapalle Pkg V [4L Access Controlled Greenfield f is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618749. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Khammam-Devarapalle Pkg V [4L Access Controlled Greenfield f is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.