Roads & HighwaysIPM · Central Project +32.2% overrun#618748

Khammam-Devarapalle Pkg IV [4L Access Controlled Greenfield from Recherla village to Gurvaygudem village Design Chainage 105236 to 132664]

Ministry of Road Transport & HighwaysAndhra Pradesh
Revised Cost: ₹752 CrUtilization: 47.3%Overrun: +₹183 Cr

Original Cost

₹569 Cr

Baseline estimate

+32% overrun

Revised Cost

₹752 Cr

Latest approved cost

Expenditure

₹356 Cr

Spent to date

Utilization

47.3%

Of revised budget

Escalated

Cost Status

+32.2%

+₹183 Cr increase

Remaining

₹396 Cr

Budget left

Budget Utilization

47.3%
0%25%50%75%100%

Spent

₹356 Cr

Remaining

₹396 Cr

Total

₹752 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹569 Cr

Revised Cost

₹752 Cr

Increase

+₹183 Cr

Escalation

+32.2%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

25/09/2024

Revised Completion

31/05/2025

Completed

Project Details

Project Code618748
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAndhra Pradesh
Data Month2026-05

Financial Summary

Original Cost₹569 Cr
Revised Cost₹752 Cr
Expenditure₹356 Cr
Original End Date25/09/2024
Revised Date31/05/2025

Project Intelligence

Cost has increased by ₹183 Cr (32.2%) from the original estimate of ₹569 Cr.

Expenditure stands at ₹356 Cr, which is 47.3% of the revised project cost.

Remaining budget: ₹396 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Khammam-Devarapalle Pkg IV [4L Access Controlled Greenfield from Recherla village to Gurvaygudem village Design Chainage 105236 to 132664] is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹569.00 Cr, later revised to ₹752.02 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Khammam-Devarapalle Pkg IV [4L Access Controlled Greenfield from Recherla villag"?
Khammam-Devarapalle Pkg IV [4L Access Controlled Greenfield from Recherla village to Gurvaygudem village Design Chainage 105236 to 132664] is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹569 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹569 Cr and has been revised to ₹752 Cr — a cost overrun of +32.2%. Expenditure to date: ₹356 Cr (47.3% of revised cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
Khammam-Devarapalle Pkg IV [4L Access Controlled Greenfield is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618748. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Khammam-Devarapalle Pkg IV [4L Access Controlled Greenfield is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.