Khammam-Devarapalle Pkg IV [4L Access Controlled Greenfield from Recherla village to Gurvaygudem village Design Chainage 105236 to 132664]
Original Cost
₹569 Cr
Baseline estimate
Revised Cost
₹752 Cr
Latest approved cost
Expenditure
₹356 Cr
Spent to date
Utilization
47.3%
Of revised budget
Cost Status
+32.2%
+₹183 Cr increase
Remaining
₹396 Cr
Budget left
Budget Utilization
47.3%Spent
₹356 Cr
Remaining
₹396 Cr
Total
₹752 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹569 Cr
Revised Cost
₹752 Cr
Increase
+₹183 Cr
Escalation
+32.2%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
25/09/2024
Revised Completion
31/05/2025
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹183 Cr (32.2%) from the original estimate of ₹569 Cr.
Expenditure stands at ₹356 Cr, which is 47.3% of the revised project cost.
Remaining budget: ₹396 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Khammam-Devarapalle Pkg IV [4L Access Controlled Greenfield from Recherla village to Gurvaygudem village Design Chainage 105236 to 132664] is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹569.00 Cr, later revised to ₹752.02 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Khammam-Devarapalle Pkg IV [4L Access Controlled Greenfield from Recherla villag"?
- Khammam-Devarapalle Pkg IV [4L Access Controlled Greenfield from Recherla village to Gurvaygudem village Design Chainage 105236 to 132664] is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹569 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹569 Cr and has been revised to ₹752 Cr — a cost overrun of +32.2%. Expenditure to date: ₹356 Cr (47.3% of revised cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Khammam-Devarapalle Pkg IV [4L Access Controlled Greenfield is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618748. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Khammam-Devarapalle Pkg IV [4L Access Controlled Greenfield is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.