ShippingIPM · Central Project#619229

Integrated development of Outer Container Terminal and berth No. 1 though 5 NSD at KDS, SMPK on DBFOT basis through PPP mode

Ministry of Ports, Shipping and WaterwaysWest Bengal
Revised Cost: ₹832 CrUtilization: 0.0%

Original Cost

₹832 Cr

Baseline estimate

On budget

Revised Cost

₹832 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹832 Cr

Budget left

Budget Utilization

0.0%
0%25%50%75%100%

Spent

₹0 Cr

Remaining

₹832 Cr

Total

₹832 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

28/08/2028

Revised Completion

Completed

Project Details

Project Code619229
SectorShipping
MinistryMinistry of Ports, Shipping and Waterways
StateWest Bengal
Data Month2026-06

Financial Summary

Original Cost₹832 Cr
Revised Cost₹832 Cr
Expenditure₹0 Cr
Original End Date28/08/2028
Revised DateN/A

Project Intelligence

Project is within original budget of ₹832 Cr — no cost escalation recorded.

Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.

Remaining budget: ₹832 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Shipping. Ministry: Ministry of Ports, Shipping and Waterways.

Integrated development of Outer Container Terminal and berth No. 1 though 5 NSD at KDS, SMPK on DBFOT basis through PPP mode is a centrally-funded infrastructure project under Ministry of Ports, Shipping and Waterways, in the Shipping sector. The original approved cost is ₹832.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Integrated development of Outer Container Terminal and berth No. 1 though 5 NSD "?
Integrated development of Outer Container Terminal and berth No. 1 though 5 NSD at KDS, SMPK on DBFOT basis through PPP mode is a centrally-funded infrastructure project under the Ministry of Ports, Shipping and Waterways, tracked through the Investment Project Monitoring (IPM) system. Sector: Shipping. State: West Bengal. Original cost: ₹832 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹832 Cr has not been significantly revised. Expenditure: ₹0 Cr (N/A% of cost). Data as of 2026-06.
QWhich ministry is responsible for this project?
Integrated development of Outer Container Terminal and berth is under the Ministry of Ports, Shipping and Waterways in the Shipping sector. Project code: 619229. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Integrated development of Outer Container Terminal and berth is one of several Bihar projects tracked under the Shipping sector on the IPM system.