Installation of Compression facility at GAIL Usar
Original Cost
₹260 Cr
Baseline estimate
Revised Cost
₹260 Cr
Latest approved cost
Expenditure
₹0 Cr
Spent to date
Utilization
0.0%
Of revised budget
Cost Status
+0.1%
+₹0 Cr increase
Remaining
₹260 Cr
Budget left
Budget Utilization
0.0%Spent
₹0 Cr
Remaining
₹260 Cr
Total
₹260 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹260 Cr
Revised Cost
₹260 Cr
Increase
+₹0 Cr
Escalation
+0.1%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
08/04/2027
Revised Completion
08/04/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹0 Cr (0.1%) from the original estimate of ₹260 Cr.
Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.
Remaining budget: ₹260 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Oil & Gas. Ministry: Ministry of Petroleum & Natural Gas.
Installation of Compression facility at GAIL Usar is a centrally-funded infrastructure project under Ministry of Petroleum & Natural Gas, in the Oil & Gas sector. The original approved cost is ₹260.00 Cr, later revised to ₹260.20 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Installation of Compression facility at GAIL Usar"?
- Installation of Compression facility at GAIL Usar is a centrally-funded infrastructure project under the Ministry of Petroleum & Natural Gas, tracked through the Investment Project Monitoring (IPM) system. Sector: Oil & Gas. State: Maharashtra. Original cost: ₹260 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹260 Cr and has been revised to ₹260 Cr — a cost overrun of +0.1%. Expenditure to date: ₹0 Cr (N/A% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Installation of Compression facility at GAIL Usar is under the Ministry of Petroleum & Natural Gas in the Oil & Gas sector. Project code: 619225. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Installation of Compression facility at GAIL Usar is one of several Bihar projects tracked under the Oil & Gas sector on the IPM system.