Improvement/Widening to 2-L with Paved Shoulder/4-L from Km 81740 to Km 93490 design Km 0000 to Km 10670 of NH-40 New NH-106 & 206 section & 4-L from design Km 0.00 to Km 0.930 of NH-44 section between Shillong-Dawki under JICA ODA Loan assistance Phase-II -Balance Work Pkg-1
Original Cost
₹351 Cr
Baseline estimate
Revised Cost
₹351 Cr
Latest approved cost
Expenditure
₹244 Cr
Spent to date
Utilization
69.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹108 Cr
Budget left
Budget Utilization
69.4%Spent
₹244 Cr
Remaining
₹108 Cr
Total
₹351 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
22/10/2025
Revised Completion
15/06/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹351 Cr — no cost escalation recorded.
Expenditure stands at ₹244 Cr, which is 69.4% of the revised project cost.
Remaining budget: ₹108 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Improvement/Widening to 2-L with Paved Shoulder/4-L from Km 81740 to Km 93490 design Km 0000 to Km 10670 of NH-40 New NH-106 & 206 section & 4-L from design Km 0.00 to Km 0.930 of NH-44 section between Shillong-Dawki under JICA ODA Loan assistance Phase-II -Balance Work Pkg-1 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹351.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Improvement/Widening to 2-L with Paved Shoulder/4-L from Km 81740 to Km 93490 de"?
- Improvement/Widening to 2-L with Paved Shoulder/4-L from Km 81740 to Km 93490 design Km 0000 to Km 10670 of NH-40 New NH-106 & 206 section & 4-L from design Km 0.00 to Km 0.930 of NH-44 section between Shillong-Dawki under JICA ODA Loan assistance Phase-II -Balance Work Pkg-1 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Meghalaya. Original cost: ₹351 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹351 Cr has not been significantly revised. Expenditure: ₹244 Cr (69.4% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Improvement/Widening to 2-L with Paved Shoulder/4-L from Km is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618377. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement/Widening to 2-L with Paved Shoulder/4-L from Km is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.