Roads & HighwaysIPM · Central Project#618217

Improvement/construction of existing Class-5 Road to NH Intermediate lane specification with hard shoulder from existing Km 76/340 to 134/940 Design chainage from Km 76/300 to 133/000 net Length 56.700 kms of NH-505 Sumdo-Kaza-Gramphoo road in the state of Himachal Pradesh Package I

Ministry of Road Transport & HighwaysHimachal Pradesh
Revised Cost: ₹244 CrUtilization: 58.0%

Original Cost

₹315 Cr

Baseline estimate

On budget

Revised Cost

₹244 Cr

Latest approved cost

Expenditure

₹142 Cr

Spent to date

Utilization

58.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹103 Cr

Budget left

Budget Utilization

58.0%
0%25%50%75%100%

Spent

₹142 Cr

Remaining

₹103 Cr

Total

₹244 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

11/05/2026

Revised Completion

31/08/2027

Completed

Project Details

Project Code618217
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateHimachal Pradesh
Data Month2026-08

Financial Summary

Original Cost₹315 Cr
Revised Cost₹244 Cr
Expenditure₹142 Cr
Original End Date11/05/2026
Revised Date31/08/2027

Project Intelligence

Project is within original budget of ₹315 Cr — no cost escalation recorded.

Expenditure stands at ₹142 Cr, which is 58.0% of the revised project cost.

Remaining budget: ₹103 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Improvement/construction of existing Class-5 Road to NH Intermediate lane specification with hard shoulder from existing Km 76/340 to 134/940 Design chainage from Km 76/300 to 133/000 net Length 56.700 kms of NH-505 Sumdo-Kaza-Gramphoo road in the state of Himachal Pradesh Package I is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹315.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Improvement/construction of existing Class-5 Road to NH Intermediate lane specif"?
Improvement/construction of existing Class-5 Road to NH Intermediate lane specification with hard shoulder from existing Km 76/340 to 134/940 Design chainage from Km 76/300 to 133/000 net Length 56.700 kms of NH-505 Sumdo-Kaza-Gramphoo road in the state of Himachal Pradesh Package I is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Himachal Pradesh. Original cost: ₹315 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹315 Cr and has been revised to ₹244 Cr — a cost overrun of -22.5%. Expenditure to date: ₹142 Cr (58.0% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Improvement/construction of existing Class-5 Road to NH Inte is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618217. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement/construction of existing Class-5 Road to NH Inte is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.