Roads & HighwaysIPM · Central Project#618350

Improvement & widening of existing NH-08 to 4-lane with Paved Shoulder from Champak Nagar to Khayerpur section design Km 242500 to Km 261610 in the state of Tripura on EPC basis under NHO-NE

Ministry of Road Transport & HighwaysTripura
Revised Cost: ₹921 CrUtilization: 44.0%

Original Cost

₹921 Cr

Baseline estimate

On budget

Revised Cost

₹921 Cr

Latest approved cost

Expenditure

₹405 Cr

Spent to date

Utilization

44.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹516 Cr

Budget left

Budget Utilization

44.0%
0%25%50%75%100%

Spent

₹405 Cr

Remaining

₹516 Cr

Total

₹921 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

28/09/2026

Revised Completion

31/03/2027

Completed

Project Details

Project Code618350
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateTripura
Data Month2026-08

Financial Summary

Original Cost₹921 Cr
Revised Cost₹921 Cr
Expenditure₹405 Cr
Original End Date28/09/2026
Revised Date31/03/2027

Project Intelligence

Project is within original budget of ₹921 Cr — no cost escalation recorded.

Expenditure stands at ₹405 Cr, which is 44.0% of the revised project cost.

Remaining budget: ₹516 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Improvement & widening of existing NH-08 to 4-lane with Paved Shoulder from Champak Nagar to Khayerpur section design Km 242500 to Km 261610 in the state of Tripura on EPC basis under NHO-NE is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹921.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Improvement & widening of existing NH-08 to 4-lane with Paved Shoulder from Cham"?
Improvement & widening of existing NH-08 to 4-lane with Paved Shoulder from Champak Nagar to Khayerpur section design Km 242500 to Km 261610 in the state of Tripura on EPC basis under NHO-NE is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Tripura. Original cost: ₹921 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹921 Cr has not been significantly revised. Expenditure: ₹405 Cr (44.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Improvement & widening of existing NH-08 to 4-lane with Pave is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618350. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement & widening of existing NH-08 to 4-lane with Pave is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.