Improvement & widening of existing NH-08 to 4-lane with Paved Shoulder from Champak Nagar to Khayerpur section design Km 242500 to Km 261610 in the state of Tripura on EPC basis under NHO-NE
Original Cost
₹921 Cr
Baseline estimate
Revised Cost
₹921 Cr
Latest approved cost
Expenditure
₹405 Cr
Spent to date
Utilization
44.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹516 Cr
Budget left
Budget Utilization
44.0%Spent
₹405 Cr
Remaining
₹516 Cr
Total
₹921 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
28/09/2026
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹921 Cr — no cost escalation recorded.
Expenditure stands at ₹405 Cr, which is 44.0% of the revised project cost.
Remaining budget: ₹516 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Improvement & widening of existing NH-08 to 4-lane with Paved Shoulder from Champak Nagar to Khayerpur section design Km 242500 to Km 261610 in the state of Tripura on EPC basis under NHO-NE is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹921.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Improvement & widening of existing NH-08 to 4-lane with Paved Shoulder from Cham"?
- Improvement & widening of existing NH-08 to 4-lane with Paved Shoulder from Champak Nagar to Khayerpur section design Km 242500 to Km 261610 in the state of Tripura on EPC basis under NHO-NE is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Tripura. Original cost: ₹921 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹921 Cr has not been significantly revised. Expenditure: ₹405 Cr (44.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Improvement & widening of existing NH-08 to 4-lane with Pave is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618350. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement & widening of existing NH-08 to 4-lane with Pave is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.