Roads & HighwaysIPM · Central Project#618367

Improvement and Widening to 2-lane with paved shoulder of road from design Km 72.000 Pati Chhari to design Km 107.654 Harina Total length 35.654 Km on Teliamura to Harina section of NH 208 in the state of Tripura on EPC mode under JICA ODA Loan Phase VI Package-4

Ministry of Road Transport & HighwaysTripura
Revised Cost: ₹727 CrUtilization: 13.9%

Original Cost

₹727 Cr

Baseline estimate

On budget

Revised Cost

₹727 Cr

Latest approved cost

Expenditure

₹101 Cr

Spent to date

Utilization

13.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹626 Cr

Budget left

Budget Utilization

13.9%
0%25%50%75%100%

Spent

₹101 Cr

Remaining

₹626 Cr

Total

₹727 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

20/12/2026

Revised Completion

23/12/2027

Completed

Project Details

Project Code618367
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateTripura
Data Month2026-08

Financial Summary

Original Cost₹727 Cr
Revised Cost₹727 Cr
Expenditure₹101 Cr
Original End Date20/12/2026
Revised Date23/12/2027

Project Intelligence

Project is within original budget of ₹727 Cr — no cost escalation recorded.

Expenditure stands at ₹101 Cr, which is 13.9% of the revised project cost.

Remaining budget: ₹626 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Improvement and Widening to 2-lane with paved shoulder of road from design Km 72.000 Pati Chhari to design Km 107.654 Harina Total length 35.654 Km on Teliamura to Harina section of NH 208 in the state of Tripura on EPC mode under JICA ODA Loan Phase VI Package-4 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹727.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Improvement and Widening to 2-lane with paved shoulder of road from design Km 72"?
Improvement and Widening to 2-lane with paved shoulder of road from design Km 72.000 Pati Chhari to design Km 107.654 Harina Total length 35.654 Km on Teliamura to Harina section of NH 208 in the state of Tripura on EPC mode under JICA ODA Loan Phase VI Package-4 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Tripura. Original cost: ₹727 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹727 Cr has not been significantly revised. Expenditure: ₹101 Cr (13.9% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Improvement and Widening to 2-lane with paved shoulder of ro is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618367. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and Widening to 2-lane with paved shoulder of ro is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.