Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
BiharInfraTalesBIHARINFRATALES
DashboardTenderCensusMP FundCabinetEC MonitoringAirportsTownshipsLitigation
  1. BiharInfraTales
  2. /IPM Dashboard
  3. /Improvement and Widening to 2-lane with paved shou
Roads & HighwaysIPM · Central Project#618367

Improvement and Widening to 2-lane with paved shoulder of road from design Km 72.000 Pati Chhari to design Km 107.654 Harina Total length 35.654 Km on Teliamura to Harina section of NH 208 in the state of Tripura on EPC mode under JICA ODA Loan Phase VI Package-4

Ministry of Road Transport & HighwaysTripuraData: 2026-05
Revised Cost: ₹727 CrUtilization: 29.4%

Original Cost

₹727 Cr

Baseline estimate

On Budget

Revised Cost

₹727 Cr

Latest approved cost

Expenditure

₹214 Cr

Spent to date

Utilization

29.4%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹514 Cr

Budget left

Budget Utilization

29.4%
0%25%50%75%100%

Spent

₹214 Cr

Remaining

₹514 Cr

Total

₹727 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

20/12/2026

Revised Completion

30/06/2027

Completed

Project Details

Project Code618367
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateTripura
Data Month2026-05

Financial & Timeline

Original Cost₹727 Cr
Revised Cost₹727 Cr
Expenditure₹214 Cr
Original End Date20/12/2026
Revised Date30/06/2027

Project Intelligence

Project is within original budget of ₹727 Cr — no cost escalation recorded.

Expenditure stands at ₹214 Cr, which is 29.4% of the revised project cost.

Remaining budget: ₹514 Cr. Project is tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Frequently Asked Questions

What is IPM project "Improvement and Widening to 2-lane with paved shoulder of road from design Km 72"?
Improvement and Widening to 2-lane with paved shoulder of road from design Km 72.000 Pati Chhari to design Km 107.654 Harina Total length 35.654 Km on Teliamura to Harina section of NH 208 in the state of Tripura on EPC mode under JICA ODA Loan Phase VI Package-4 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Tripura. Original cost: ₹727 Cr.
What is the cost overrun for this Bihar IPM project?
The original cost of ₹727 Cr has not been significantly revised. Expenditure: ₹214 Cr (29.4% of cost). Data as of 2026-05.
Which ministry is responsible for this project?
Improvement and Widening to 2-lane with paved shoulder of ro is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618367. Bihar is one of the states tracked under the central IPM dashboard for this project.
What is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and Widening to 2-lane with paved shoulder of ro is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.

Related Resources

IPM

IPM Central Project Dashboard

All central infrastructure projects in Bihar

Projects

Bihar State Projects

State-funded infrastructure project tracker

NHAI

NHAI Drone Tracker

Real-time NHAI highway construction monitoring

Railway

Bihar Railway Projects

Railway infrastructure project tracker

RCD

Bihar RCD PMIS

State road and bridge project tracker

Tenders

Bihar Government Tenders

Procurement notices for infrastructure projects

Cabinet

Bihar Cabinet Decisions

Policy approvals for infrastructure

EC

EC & Forest Clearances

Environmental clearances for Bihar projects

Upcoming

Upcoming Bihar Projects

Infrastructure pipeline and future projects

Districts

Bihar District Data

District demographics and infrastructure overview