Improvement and upgradation to two lane with paved shoulder configuration from existing km 90.00 to 130.00 Design length 39.15 of NH-227A near Sikriganj to Barhalganj in the State of UP on EPC Mode.
Original Cost
₹403 Cr
Baseline estimate
Revised Cost
₹345 Cr
Latest approved cost
Expenditure
₹204 Cr
Spent to date
Utilization
59.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹141 Cr
Budget left
Budget Utilization
59.2%Spent
₹204 Cr
Remaining
₹141 Cr
Total
₹345 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
10/06/2025
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹403 Cr — no cost escalation recorded.
Expenditure stands at ₹204 Cr, which is 59.2% of the revised project cost.
Remaining budget: ₹141 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Improvement and upgradation to two lane with paved shoulder configuration from existing km 90.00 to 130.00 Design length 39.15 of NH-227A near Sikriganj to Barhalganj in the State of UP on EPC Mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹403.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Improvement and upgradation to two lane with paved shoulder configuration from e"?
- Improvement and upgradation to two lane with paved shoulder configuration from existing km 90.00 to 130.00 Design length 39.15 of NH-227A near Sikriganj to Barhalganj in the State of UP on EPC Mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹403 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹403 Cr and has been revised to ₹345 Cr — a cost overrun of -14.3%. Expenditure to date: ₹204 Cr (59.2% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Improvement and upgradation to two lane with paved shoulder is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618111. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and upgradation to two lane with paved shoulder is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.