Roads & HighwaysIPM · Central Project#618110

Improvement and upgradation to two lane with Paved Shoulder configuration from existing km 55.00 to km 90.00 Design length 34.76 of NH-227A near Chhapia Village to near Sikriganj in the State of UP on EPC Mode.

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹307 CrUtilization: 41.0%

Original Cost

₹307 Cr

Baseline estimate

On budget

Revised Cost

₹307 Cr

Latest approved cost

Expenditure

₹126 Cr

Spent to date

Utilization

41.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹181 Cr

Budget left

Budget Utilization

41.0%
0%25%50%75%100%

Spent

₹126 Cr

Remaining

₹181 Cr

Total

₹307 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

02/05/2024

Revised Completion

05/07/2025

Completed

Project Details

Project Code618110
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-05

Financial Summary

Original Cost₹307 Cr
Revised Cost₹307 Cr
Expenditure₹126 Cr
Original End Date02/05/2024
Revised Date05/07/2025

Project Intelligence

Project is within original budget of ₹307 Cr — no cost escalation recorded.

Expenditure stands at ₹126 Cr, which is 41.0% of the revised project cost.

Remaining budget: ₹181 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Improvement and upgradation to two lane with Paved Shoulder configuration from existing km 55.00 to km 90.00 Design length 34.76 of NH-227A near Chhapia Village to near Sikriganj in the State of UP on EPC Mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹307.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Improvement and upgradation to two lane with Paved Shoulder configuration from e"?
Improvement and upgradation to two lane with Paved Shoulder configuration from existing km 55.00 to km 90.00 Design length 34.76 of NH-227A near Chhapia Village to near Sikriganj in the State of UP on EPC Mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹307 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹307 Cr has not been significantly revised. Expenditure: ₹126 Cr (41.0% of cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
Improvement and upgradation to two lane with Paved Shoulder is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618110. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and upgradation to two lane with Paved Shoulder is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.