Roads & HighwaysIPM · Central Project +38.1% overrun#618252

Improvement and Up-gradation to two Lane with Paved Shoulder/Four Lane configuration from existing Km 130.000 to Km 191.000 design km 131.500 to Km 188.735, Design length 57.235 Km of NH-227A near Barhalganj to Mehrauna Ghat in the state of Uttar Pradesh on Hybrid Annuity Model HAM basis

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹1345 CrUtilization: 56.9%Overrun: +₹371 Cr

Original Cost

₹974 Cr

Baseline estimate

+38% overrun

Revised Cost

₹1345 Cr

Latest approved cost

Expenditure

₹765 Cr

Spent to date

Utilization

56.9%

Of revised budget

Escalated

Cost Status

+38.1%

+₹371 Cr increase

Remaining

₹579 Cr

Budget left

Budget Utilization

56.9%
0%25%50%75%100%

Spent

₹765 Cr

Remaining

₹579 Cr

Total

₹1345 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹974 Cr

Revised Cost

₹1345 Cr

Increase

+₹371 Cr

Escalation

+38.1%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

04/05/2027

Revised Completion

03/05/2027

Completed

Project Details

Project Code618252
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹974 Cr
Revised Cost₹1345 Cr
Expenditure₹765 Cr
Original End Date04/05/2027
Revised Date03/05/2027

Project Intelligence

Cost has increased by ₹371 Cr (38.1%) from the original estimate of ₹974 Cr.

Expenditure stands at ₹765 Cr, which is 56.9% of the revised project cost.

Remaining budget: ₹579 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Improvement and Up-gradation to two Lane with Paved Shoulder/Four Lane configuration from existing Km 130.000 to Km 191.000 design km 131.500 to Km 188.735, Design length 57.235 Km of NH-227A near Barhalganj to Mehrauna Ghat in the state of Uttar Pradesh on Hybrid Annuity Model HAM basis is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹974.00 Cr, later revised to ₹1344.61 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Improvement and Up-gradation to two Lane with Paved Shoulder/Four Lane configura"?
Improvement and Up-gradation to two Lane with Paved Shoulder/Four Lane configuration from existing Km 130.000 to Km 191.000 design km 131.500 to Km 188.735, Design length 57.235 Km of NH-227A near Barhalganj to Mehrauna Ghat in the state of Uttar Pradesh on Hybrid Annuity Model HAM basis is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹974 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹974 Cr and has been revised to ₹1345 Cr — a cost overrun of +38.1%. Expenditure to date: ₹765 Cr (56.9% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Improvement and Up-gradation to two Lane with Paved Shoulder is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618252. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and Up-gradation to two Lane with Paved Shoulder is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.