Original Cost
₹974 Cr
Baseline estimate
Revised Cost
₹1345 Cr
Latest approved cost
Expenditure
₹765 Cr
Spent to date
Utilization
56.9%
Of revised budget
Cost Status
+38.1%
+₹371 Cr increase
Remaining
₹579 Cr
Budget left
Budget Utilization
56.9%Spent
₹765 Cr
Remaining
₹579 Cr
Total
₹1345 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹974 Cr
Revised Cost
₹1345 Cr
Increase
+₹371 Cr
Escalation
+38.1%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
04/05/2027
Revised Completion
03/05/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹371 Cr (38.1%) from the original estimate of ₹974 Cr.
Expenditure stands at ₹765 Cr, which is 56.9% of the revised project cost.
Remaining budget: ₹579 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Improvement and Up-gradation to two Lane with Paved Shoulder/Four Lane configuration from existing Km 130.000 to Km 191.000 design km 131.500 to Km 188.735, Design length 57.235 Km of NH-227A near Barhalganj to Mehrauna Ghat in the state of Uttar Pradesh on Hybrid Annuity Model HAM basis is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹974.00 Cr, later revised to ₹1344.61 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Improvement and Up-gradation to two Lane with Paved Shoulder/Four Lane configura"?
- Improvement and Up-gradation to two Lane with Paved Shoulder/Four Lane configuration from existing Km 130.000 to Km 191.000 design km 131.500 to Km 188.735, Design length 57.235 Km of NH-227A near Barhalganj to Mehrauna Ghat in the state of Uttar Pradesh on Hybrid Annuity Model HAM basis is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹974 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹974 Cr and has been revised to ₹1345 Cr — a cost overrun of +38.1%. Expenditure to date: ₹765 Cr (56.9% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Improvement and Up-gradation to two Lane with Paved Shoulder is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618252. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and Up-gradation to two Lane with Paved Shoulder is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.