Roads & HighwaysIPM · Central Project#618056

Improvement and Up-gradation to two Lane with Paved Shoulder Configuration from existing km. 420.00 Shohrathgarh to km. 454.00 Uska Bazar of NH-730 in the state of Uttar Pradesh EPC basis

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹484 CrUtilization: 55.4%

Original Cost

₹510 Cr

Baseline estimate

On budget

Revised Cost

₹484 Cr

Latest approved cost

Expenditure

₹268 Cr

Spent to date

Utilization

55.4%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹216 Cr

Budget left

Budget Utilization

55.4%
0%25%50%75%100%

Spent

₹268 Cr

Remaining

₹216 Cr

Total

₹484 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

14/09/2025

Revised Completion

31/12/2026

Completed

Project Details

Project Code618056
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹510 Cr
Revised Cost₹484 Cr
Expenditure₹268 Cr
Original End Date14/09/2025
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹510 Cr — no cost escalation recorded.

Expenditure stands at ₹268 Cr, which is 55.4% of the revised project cost.

Remaining budget: ₹216 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Improvement and Up-gradation to two Lane with Paved Shoulder Configuration from existing km. 420.00 Shohrathgarh to km. 454.00 Uska Bazar of NH-730 in the state of Uttar Pradesh EPC basis is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹510.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Improvement and Up-gradation to two Lane with Paved Shoulder Configuration from "?
Improvement and Up-gradation to two Lane with Paved Shoulder Configuration from existing km. 420.00 Shohrathgarh to km. 454.00 Uska Bazar of NH-730 in the state of Uttar Pradesh EPC basis is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹510 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹510 Cr and has been revised to ₹484 Cr — a cost overrun of -5%. Expenditure to date: ₹268 Cr (55.4% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Improvement and Up-gradation to two Lane with Paved Shoulder is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618056. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement and Up-gradation to two Lane with Paved Shoulder is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.