Construction/Up gradation of Existing road to 2 Lane with Paved Shoulder including Geometric Improvement from Ranipool to Pakyong Balance work from Km 2.000 to 16.167 of NH-717-A on EPC basis under SARDP-NE Phase A in the State of Sikkim
Original Cost
₹265 Cr
Baseline estimate
Revised Cost
₹381 Cr
Latest approved cost
Expenditure
₹127 Cr
Spent to date
Utilization
33.4%
Of revised budget
Cost Status
+43.8%
+₹116 Cr increase
Remaining
₹254 Cr
Budget left
Budget Utilization
33.4%Spent
₹127 Cr
Remaining
₹254 Cr
Total
₹381 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹265 Cr
Revised Cost
₹381 Cr
Increase
+₹116 Cr
Escalation
+43.8%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
06/07/2024
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹116 Cr (43.8%) from the original estimate of ₹265 Cr.
Expenditure stands at ₹127 Cr, which is 33.4% of the revised project cost.
Remaining budget: ₹254 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction/Up gradation of Existing road to 2 Lane with Paved Shoulder including Geometric Improvement from Ranipool to Pakyong Balance work from Km 2.000 to 16.167 of NH-717-A on EPC basis under SARDP-NE Phase A in the State of Sikkim is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹265.00 Cr, later revised to ₹380.94 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction/Up gradation of Existing road to 2 Lane with Paved Shoulder includi"?
- Construction/Up gradation of Existing road to 2 Lane with Paved Shoulder including Geometric Improvement from Ranipool to Pakyong Balance work from Km 2.000 to 16.167 of NH-717-A on EPC basis under SARDP-NE Phase A in the State of Sikkim is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Sikkim. Original cost: ₹265 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹265 Cr and has been revised to ₹381 Cr — a cost overrun of +43.8%. Expenditure to date: ₹127 Cr (33.4% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction/Up gradation of Existing road to 2 Lane with Pa is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618426. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction/Up gradation of Existing road to 2 Lane with Pa is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.