Roads & HighwaysIPM · Central Project +43.8% overrun#618426

Construction/Up gradation of Existing road to 2 Lane with Paved Shoulder including Geometric Improvement from Ranipool to Pakyong Balance work from Km 2.000 to 16.167 of NH-717-A on EPC basis under SARDP-NE Phase A in the State of Sikkim

Ministry of Road Transport & HighwaysSikkim
Revised Cost: ₹381 CrUtilization: 33.4%Overrun: +₹116 Cr

Original Cost

₹265 Cr

Baseline estimate

+44% overrun

Revised Cost

₹381 Cr

Latest approved cost

Expenditure

₹127 Cr

Spent to date

Utilization

33.4%

Of revised budget

Escalated

Cost Status

+43.8%

+₹116 Cr increase

Remaining

₹254 Cr

Budget left

Budget Utilization

33.4%
0%25%50%75%100%

Spent

₹127 Cr

Remaining

₹254 Cr

Total

₹381 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹265 Cr

Revised Cost

₹381 Cr

Increase

+₹116 Cr

Escalation

+43.8%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

06/07/2024

Revised Completion

31/12/2026

Completed

Project Details

Project Code618426
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateSikkim
Data Month2026-08

Financial Summary

Original Cost₹265 Cr
Revised Cost₹381 Cr
Expenditure₹127 Cr
Original End Date06/07/2024
Revised Date31/12/2026

Project Intelligence

Cost has increased by ₹116 Cr (43.8%) from the original estimate of ₹265 Cr.

Expenditure stands at ₹127 Cr, which is 33.4% of the revised project cost.

Remaining budget: ₹254 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction/Up gradation of Existing road to 2 Lane with Paved Shoulder including Geometric Improvement from Ranipool to Pakyong Balance work from Km 2.000 to 16.167 of NH-717-A on EPC basis under SARDP-NE Phase A in the State of Sikkim is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹265.00 Cr, later revised to ₹380.94 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction/Up gradation of Existing road to 2 Lane with Paved Shoulder includi"?
Construction/Up gradation of Existing road to 2 Lane with Paved Shoulder including Geometric Improvement from Ranipool to Pakyong Balance work from Km 2.000 to 16.167 of NH-717-A on EPC basis under SARDP-NE Phase A in the State of Sikkim is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Sikkim. Original cost: ₹265 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹265 Cr and has been revised to ₹381 Cr — a cost overrun of +43.8%. Expenditure to date: ₹127 Cr (33.4% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction/Up gradation of Existing road to 2 Lane with Pa is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618426. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction/Up gradation of Existing road to 2 Lane with Pa is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.