Construction & Upgradation to 2-lane with paved shoulder from Design Km 67.805 at the end of Km 83rd Tunnel near Dhrabshalla Ex. Km 83905 to Km 80.675 start of Kishtwar Bypass - Dulhasti Ex. Km 970751 of 12.870 Km length on chenani-Sudhmahadev-Goha Khellani-Kishtwar-vailoo-Donipawa-Ashajipora seition of NH-244 in the UT of J&K on EPC Mode under NHO-Gen Pkg-3
Original Cost
₹399 Cr
Baseline estimate
Revised Cost
₹399 Cr
Latest approved cost
Expenditure
₹120 Cr
Spent to date
Utilization
30.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹279 Cr
Budget left
Budget Utilization
30.1%Spent
₹120 Cr
Remaining
₹279 Cr
Total
₹399 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/12/2022
Revised Completion
31/08/2025
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹399 Cr — no cost escalation recorded.
Expenditure stands at ₹120 Cr, which is 30.1% of the revised project cost.
Remaining budget: ₹279 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction & Upgradation to 2-lane with paved shoulder from Design Km 67.805 at the end of Km 83rd Tunnel near Dhrabshalla Ex. Km 83905 to Km 80.675 start of Kishtwar Bypass - Dulhasti Ex. Km 970751 of 12.870 Km length on chenani-Sudhmahadev-Goha Khellani-Kishtwar-vailoo-Donipawa-Ashajipora seition of NH-244 in the UT of J&K on EPC Mode under NHO-Gen Pkg-3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹399.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction & Upgradation to 2-lane with paved shoulder from Design Km 67.805 a"?
- Construction & Upgradation to 2-lane with paved shoulder from Design Km 67.805 at the end of Km 83rd Tunnel near Dhrabshalla Ex. Km 83905 to Km 80.675 start of Kishtwar Bypass - Dulhasti Ex. Km 970751 of 12.870 Km length on chenani-Sudhmahadev-Goha Khellani-Kishtwar-vailoo-Donipawa-Ashajipora seition of NH-244 in the UT of J&K on EPC Mode under NHO-Gen Pkg-3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹399 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹399 Cr has not been significantly revised. Expenditure: ₹120 Cr (30.1% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction & Upgradation to 2-lane with paved shoulder fro is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618400. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction & Upgradation to 2-lane with paved shoulder fro is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.