Roads & HighwaysIPM · Central Project#618400

Construction & Upgradation to 2-lane with paved shoulder from Design Km 67.805 at the end of Km 83rd Tunnel near Dhrabshalla Ex. Km 83905 to Km 80.675 start of Kishtwar Bypass - Dulhasti Ex. Km 970751 of 12.870 Km length on chenani-Sudhmahadev-Goha Khellani-Kishtwar-vailoo-Donipawa-Ashajipora seition of NH-244 in the UT of J&K on EPC Mode under NHO-Gen Pkg-3

Ministry of Road Transport & HighwaysJammu & Kashmir
Revised Cost: ₹399 CrUtilization: 30.1%

Original Cost

₹399 Cr

Baseline estimate

On budget

Revised Cost

₹399 Cr

Latest approved cost

Expenditure

₹120 Cr

Spent to date

Utilization

30.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹279 Cr

Budget left

Budget Utilization

30.1%
0%25%50%75%100%

Spent

₹120 Cr

Remaining

₹279 Cr

Total

₹399 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/12/2022

Revised Completion

31/08/2025

Completed

Project Details

Project Code618400
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateJammu & Kashmir
Data Month2026-08

Financial Summary

Original Cost₹399 Cr
Revised Cost₹399 Cr
Expenditure₹120 Cr
Original End Date31/12/2022
Revised Date31/08/2025

Project Intelligence

Project is within original budget of ₹399 Cr — no cost escalation recorded.

Expenditure stands at ₹120 Cr, which is 30.1% of the revised project cost.

Remaining budget: ₹279 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction & Upgradation to 2-lane with paved shoulder from Design Km 67.805 at the end of Km 83rd Tunnel near Dhrabshalla Ex. Km 83905 to Km 80.675 start of Kishtwar Bypass - Dulhasti Ex. Km 970751 of 12.870 Km length on chenani-Sudhmahadev-Goha Khellani-Kishtwar-vailoo-Donipawa-Ashajipora seition of NH-244 in the UT of J&K on EPC Mode under NHO-Gen Pkg-3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹399.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction & Upgradation to 2-lane with paved shoulder from Design Km 67.805 a"?
Construction & Upgradation to 2-lane with paved shoulder from Design Km 67.805 at the end of Km 83rd Tunnel near Dhrabshalla Ex. Km 83905 to Km 80.675 start of Kishtwar Bypass - Dulhasti Ex. Km 970751 of 12.870 Km length on chenani-Sudhmahadev-Goha Khellani-Kishtwar-vailoo-Donipawa-Ashajipora seition of NH-244 in the UT of J&K on EPC Mode under NHO-Gen Pkg-3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹399 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹399 Cr has not been significantly revised. Expenditure: ₹120 Cr (30.1% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction & Upgradation to 2-lane with paved shoulder fro is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618400. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction & Upgradation to 2-lane with paved shoulder fro is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.