Roads & HighwaysIPM · Central Project#618427

Construction & upgradation of existing road to 2-lane with paved shoulder including geometric improvement of Kafer- Lava More section from km 40.00 to km 61.100 of NH717-A on EPC under SARDP-NE A in state of West Bengal Pkg-VA

Ministry of Road Transport & HighwaysWest Bengal
Revised Cost: ₹274 CrUtilization: 98.0%

Original Cost

₹311 Cr

Baseline estimate

On budget

Revised Cost

₹274 Cr

Latest approved cost

Expenditure

₹268 Cr

Spent to date

Utilization

98.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹6 Cr

Budget left

Budget Utilization

98.0%
0%25%50%75%100%

Spent

₹268 Cr

Remaining

₹6 Cr

Total

₹274 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

05/04/2023

Revised Completion

31/12/2026

Completed

Project Details

Project Code618427
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateWest Bengal
Data Month2026-08

Financial Summary

Original Cost₹311 Cr
Revised Cost₹274 Cr
Expenditure₹268 Cr
Original End Date05/04/2023
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹311 Cr — no cost escalation recorded.

Expenditure stands at ₹268 Cr, which is 98.0% of the revised project cost.

Remaining budget: ₹6 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction & upgradation of existing road to 2-lane with paved shoulder including geometric improvement of Kafer- Lava More section from km 40.00 to km 61.100 of NH717-A on EPC under SARDP-NE A in state of West Bengal Pkg-VA is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹311.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction & upgradation of existing road to 2-lane with paved shoulder includ"?
Construction & upgradation of existing road to 2-lane with paved shoulder including geometric improvement of Kafer- Lava More section from km 40.00 to km 61.100 of NH717-A on EPC under SARDP-NE A in state of West Bengal Pkg-VA is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: West Bengal. Original cost: ₹311 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹311 Cr and has been revised to ₹274 Cr — a cost overrun of -12%. Expenditure to date: ₹268 Cr (98.0% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction & upgradation of existing road to 2-lane with p is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618427. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction & upgradation of existing road to 2-lane with p is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.