Roads & HighwaysIPM · Central Project#618446

Construction & Upgradation of existing road to 2-lane with paved shoulder from New Rolep Bridge at km 37.600 to Chochenpheri at km 52.00 in the section of Rongli to Chochenpheri of NH 717B Pkg-II C

Ministry of Road Transport & HighwaysSikkim
Revised Cost: ₹479 CrUtilization: 82.5%

Original Cost

₹493 Cr

Baseline estimate

On budget

Revised Cost

₹479 Cr

Latest approved cost

Expenditure

₹395 Cr

Spent to date

Utilization

82.5%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹84 Cr

Budget left

Budget Utilization

82.5%
0%25%50%75%100%

Spent

₹395 Cr

Remaining

₹84 Cr

Total

₹479 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

23/05/2024

Revised Completion

30/09/2026

Completed

Project Details

Project Code618446
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateSikkim
Data Month2026-08

Financial Summary

Original Cost₹493 Cr
Revised Cost₹479 Cr
Expenditure₹395 Cr
Original End Date23/05/2024
Revised Date30/09/2026

Project Intelligence

Project is within original budget of ₹493 Cr — no cost escalation recorded.

Expenditure stands at ₹395 Cr, which is 82.5% of the revised project cost.

Remaining budget: ₹84 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction & Upgradation of existing road to 2-lane with paved shoulder from New Rolep Bridge at km 37.600 to Chochenpheri at km 52.00 in the section of Rongli to Chochenpheri of NH 717B Pkg-II C is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹493.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction & Upgradation of existing road to 2-lane with paved shoulder from N"?
Construction & Upgradation of existing road to 2-lane with paved shoulder from New Rolep Bridge at km 37.600 to Chochenpheri at km 52.00 in the section of Rongli to Chochenpheri of NH 717B Pkg-II C is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Sikkim. Original cost: ₹493 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹493 Cr and has been revised to ₹479 Cr — a cost overrun of -2.9%. Expenditure to date: ₹395 Cr (82.5% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction & Upgradation of existing road to 2-lane with p is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618446. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction & Upgradation of existing road to 2-lane with p is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.