Roads & HighwaysIPM · Central Project#618169

Construction of Two Lane with paved shoulder highway from Design Ch.0.000 to Ch.49.2OO of NH-731B on EPC Mode

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹603 CrUtilization: 96.4%

Original Cost

₹640 Cr

Baseline estimate

On budget

Revised Cost

₹603 Cr

Latest approved cost

Expenditure

₹581 Cr

Spent to date

Utilization

96.4%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹22 Cr

Budget left

Budget Utilization

96.4%
0%25%50%75%100%

Spent

₹581 Cr

Remaining

₹22 Cr

Total

₹603 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

29/11/2025

Revised Completion

30/09/2026

Completed

Project Details

Project Code618169
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹640 Cr
Revised Cost₹603 Cr
Expenditure₹581 Cr
Original End Date29/11/2025
Revised Date30/09/2026

Project Intelligence

Project is within original budget of ₹640 Cr — no cost escalation recorded.

Expenditure stands at ₹581 Cr, which is 96.4% of the revised project cost.

Remaining budget: ₹22 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of Two Lane with paved shoulder highway from Design Ch.0.000 to Ch.49.2OO of NH-731B on EPC Mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹640.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of Two Lane with paved shoulder highway from Design Ch.0.000 to Ch."?
Construction of Two Lane with paved shoulder highway from Design Ch.0.000 to Ch.49.2OO of NH-731B on EPC Mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹640 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹640 Cr and has been revised to ₹603 Cr — a cost overrun of -5.8%. Expenditure to date: ₹581 Cr (96.4% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of Two Lane with paved shoulder highway from De is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618169. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Two Lane with paved shoulder highway from De is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.