Construction of Six lane elevated flyover including reconstruction/rehabilitation of existing pavement from Km 406100 to Km 411150 Length 5.05 Km at Gobindpur area in the Barwa Adda Panagarh section of NH-19 from Km.398.240 to Km.521.120 including Panagarh Bypass in the State of Jharkhand on EPC Mode.
Original Cost
₹688 Cr
Baseline estimate
Revised Cost
₹443 Cr
Latest approved cost
Expenditure
₹81 Cr
Spent to date
Utilization
18.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹362 Cr
Budget left
Budget Utilization
18.2%Spent
₹81 Cr
Remaining
₹362 Cr
Total
₹443 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
21/03/2028
Revised Completion
21/03/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹688 Cr — no cost escalation recorded.
Expenditure stands at ₹81 Cr, which is 18.2% of the revised project cost.
Remaining budget: ₹362 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Six lane elevated flyover including reconstruction/rehabilitation of existing pavement from Km 406100 to Km 411150 Length 5.05 Km at Gobindpur area in the Barwa Adda Panagarh section of NH-19 from Km.398.240 to Km.521.120 including Panagarh Bypass in the State of Jharkhand on EPC Mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹688.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Six lane elevated flyover including reconstruction/rehabilitatio"?
- Construction of Six lane elevated flyover including reconstruction/rehabilitation of existing pavement from Km 406100 to Km 411150 Length 5.05 Km at Gobindpur area in the Barwa Adda Panagarh section of NH-19 from Km.398.240 to Km.521.120 including Panagarh Bypass in the State of Jharkhand on EPC Mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jharkhand. Original cost: ₹688 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹688 Cr and has been revised to ₹443 Cr — a cost overrun of -35.7%. Expenditure to date: ₹81 Cr (18.2% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Six lane elevated flyover including reconstr is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618535. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Six lane elevated flyover including reconstr is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.