Construction of six lane elevated corridor from km 7.950 Uppal to km 14.200 of NH-163 to De-Congest the urban limits of Hyderabad-Bhoopalapatnam section on EPC mode in the state of Telangana
Original Cost
₹627 Cr
Baseline estimate
Revised Cost
₹627 Cr
Latest approved cost
Expenditure
₹291 Cr
Spent to date
Utilization
46.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹336 Cr
Budget left
Budget Utilization
46.4%Spent
₹291 Cr
Remaining
₹336 Cr
Total
₹627 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
01/07/2020
Revised Completion
31/12/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹627 Cr — no cost escalation recorded.
Expenditure stands at ₹291 Cr, which is 46.4% of the revised project cost.
Remaining budget: ₹336 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of six lane elevated corridor from km 7.950 Uppal to km 14.200 of NH-163 to De-Congest the urban limits of Hyderabad-Bhoopalapatnam section on EPC mode in the state of Telangana is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹627.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of six lane elevated corridor from km 7.950 Uppal to km 14.200 of "?
- Construction of six lane elevated corridor from km 7.950 Uppal to km 14.200 of NH-163 to De-Congest the urban limits of Hyderabad-Bhoopalapatnam section on EPC mode in the state of Telangana is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹627 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹627 Cr has not been significantly revised. Expenditure: ₹291 Cr (46.4% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of six lane elevated corridor from km 7.950 Up is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617980. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of six lane elevated corridor from km 7.950 Up is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.