Original Cost
₹547 Cr
Baseline estimate
Revised Cost
₹547 Cr
Latest approved cost
Expenditure
₹194 Cr
Spent to date
Utilization
35.5%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹353 Cr
Budget left
Budget Utilization
35.5%Spent
₹194 Cr
Remaining
₹353 Cr
Total
₹547 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
11/01/2028
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹547 Cr — no cost escalation recorded.
Expenditure stands at ₹194 Cr, which is 35.5% of the revised project cost.
Remaining budget: ₹353 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Shopian Bypass on NH-444 taking off from existing chainage Km 36500 and re-joining at km 47588 of existing Chainage New Design Ch. From km 28000 to km 36925 as 2- lane with paved shoulder in the UT of Jammu & Kashmir on EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹547.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Shopian Bypass on NH-444 taking off from existing chainage Km "?
- Construction of Shopian Bypass on NH-444 taking off from existing chainage Km 36500 and re-joining at km 47588 of existing Chainage New Design Ch. From km 28000 to km 36925 as 2- lane with paved shoulder in the UT of Jammu & Kashmir on EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹547 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹547 Cr has not been significantly revised. Expenditure: ₹194 Cr (35.5% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Shopian Bypass on NH-444 taking off from e is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618038. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Shopian Bypass on NH-444 taking off from e is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.