Construction of Rewa Bypass to 4-lane with paved shoulder along with service road from Ratahara Chowk to Chorhata Chowk Road section of NH-30 from km 00.000 to 19.200 in the State of Madhya Pradesh on Hybrid Annuity Mode HAM.
Original Cost
₹648 Cr
Baseline estimate
Revised Cost
₹648 Cr
Latest approved cost
Expenditure
₹119 Cr
Spent to date
Utilization
18.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹529 Cr
Budget left
Budget Utilization
18.4%Spent
₹119 Cr
Remaining
₹529 Cr
Total
₹648 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
26/02/2027
Revised Completion
26/02/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹648 Cr — no cost escalation recorded.
Expenditure stands at ₹119 Cr, which is 18.4% of the revised project cost.
Remaining budget: ₹529 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Rewa Bypass to 4-lane with paved shoulder along with service road from Ratahara Chowk to Chorhata Chowk Road section of NH-30 from km 00.000 to 19.200 in the State of Madhya Pradesh on Hybrid Annuity Mode HAM. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹648.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Rewa Bypass to 4-lane with paved shoulder along with service roa"?
- Construction of Rewa Bypass to 4-lane with paved shoulder along with service road from Ratahara Chowk to Chorhata Chowk Road section of NH-30 from km 00.000 to 19.200 in the State of Madhya Pradesh on Hybrid Annuity Mode HAM. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹648 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹648 Cr has not been significantly revised. Expenditure: ₹119 Cr (18.4% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Rewa Bypass to 4-lane with paved shoulder al is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617909. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Rewa Bypass to 4-lane with paved shoulder al is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.