Construction of new 4 lane major bridge with approaches on Sabarmati River near Dharoi at Km. 82/00 to 86/00 Design length 3.300 km on NH-58 in the State of Gujarat on Hybrid Annuity Mode HAM
Original Cost
₹398 Cr
Baseline estimate
Revised Cost
₹398 Cr
Latest approved cost
Expenditure
₹98 Cr
Spent to date
Utilization
24.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹300 Cr
Budget left
Budget Utilization
24.6%Spent
₹98 Cr
Remaining
₹300 Cr
Total
₹398 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
19/08/2027
Revised Completion
19/08/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹398 Cr — no cost escalation recorded.
Expenditure stands at ₹98 Cr, which is 24.6% of the revised project cost.
Remaining budget: ₹300 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of new 4 lane major bridge with approaches on Sabarmati River near Dharoi at Km. 82/00 to 86/00 Design length 3.300 km on NH-58 in the State of Gujarat on Hybrid Annuity Mode HAM is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹398.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of new 4 lane major bridge with approaches on Sabarmati River near "?
- Construction of new 4 lane major bridge with approaches on Sabarmati River near Dharoi at Km. 82/00 to 86/00 Design length 3.300 km on NH-58 in the State of Gujarat on Hybrid Annuity Mode HAM is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Gujarat. Original cost: ₹398 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹398 Cr has not been significantly revised. Expenditure: ₹98 Cr (24.6% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of new 4 lane major bridge with approaches on S is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617926. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of new 4 lane major bridge with approaches on S is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.