Construction of Major Bridge at Km.180.865 across river Krishna on NH 167 Hagari Jadcherla section
Original Cost
₹157 Cr
Baseline estimate
Revised Cost
₹188 Cr
Latest approved cost
Expenditure
₹16.7K Cr
Spent to date
Utilization
8908.5%
Of revised budget
Cost Status
+19.5%
+₹31 Cr increase
Remaining
₹0 Cr
Budget left
Budget Utilization
8908.5%Spent
₹16.7K Cr
Remaining
₹0 Cr
Total
₹188 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹157 Cr
Revised Cost
₹188 Cr
Increase
+₹31 Cr
Escalation
+19.5%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
06/11/2021
Revised Completion
30/04/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹31 Cr (19.5%) from the original estimate of ₹157 Cr.
Expenditure stands at ₹16.7K Cr, which is 8908.5% of the revised project cost.
Remaining budget: ₹0 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Major Bridge at Km.180.865 across river Krishna on NH 167 Hagari Jadcherla section is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹157.00 Cr, later revised to ₹187.61 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Major Bridge at Km.180.865 across river Krishna on NH 167 Hagari"?
- Construction of Major Bridge at Km.180.865 across river Krishna on NH 167 Hagari Jadcherla section is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹157 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹157 Cr and has been revised to ₹188 Cr — a cost overrun of +19.5%. Expenditure to date: ₹16713 Cr (8908.5% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Major Bridge at Km.180.865 across river Kris is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617989. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Major Bridge at Km.180.865 across river Kris is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.