Construction of lntermediate Lane Road with hard shoulder from design chainage Km 0.000 to Km 53.040 Existing Length68.500 Km & Total Design length 53.04 km of Tato to Monigong section of NH-913 Frontier Highway on Nafra Bomdila to Vijaynagar along China border in state of Arunachal pradesh on EPC mode
Original Cost
₹626 Cr
Baseline estimate
Revised Cost
₹626 Cr
Latest approved cost
Expenditure
₹275 Cr
Spent to date
Utilization
43.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹351 Cr
Budget left
Budget Utilization
43.9%Spent
₹275 Cr
Remaining
₹351 Cr
Total
₹626 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
14/11/2027
Revised Completion
14/11/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹626 Cr — no cost escalation recorded.
Expenditure stands at ₹275 Cr, which is 43.9% of the revised project cost.
Remaining budget: ₹351 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of lntermediate Lane Road with hard shoulder from design chainage Km 0.000 to Km 53.040 Existing Length68.500 Km & Total Design length 53.04 km of Tato to Monigong section of NH-913 Frontier Highway on Nafra Bomdila to Vijaynagar along China border in state of Arunachal pradesh on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹626.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of lntermediate Lane Road with hard shoulder from design chainage K"?
- Construction of lntermediate Lane Road with hard shoulder from design chainage Km 0.000 to Km 53.040 Existing Length68.500 Km & Total Design length 53.04 km of Tato to Monigong section of NH-913 Frontier Highway on Nafra Bomdila to Vijaynagar along China border in state of Arunachal pradesh on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Arunachal Pradesh. Original cost: ₹626 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹626 Cr has not been significantly revised. Expenditure: ₹275 Cr (43.9% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of lntermediate Lane Road with hard shoulder fr is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618404. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of lntermediate Lane Road with hard shoulder fr is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.