Roads & HighwaysIPM · Central Project#618404

Construction of lntermediate Lane Road with hard shoulder from design chainage Km 0.000 to Km 53.040 Existing Length68.500 Km & Total Design length 53.04 km of Tato to Monigong section of NH-913 Frontier Highway on Nafra Bomdila to Vijaynagar along China border in state of Arunachal pradesh on EPC mode

Ministry of Road Transport & HighwaysArunachal Pradesh
Revised Cost: ₹626 CrUtilization: 43.9%

Original Cost

₹626 Cr

Baseline estimate

On budget

Revised Cost

₹626 Cr

Latest approved cost

Expenditure

₹275 Cr

Spent to date

Utilization

43.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹351 Cr

Budget left

Budget Utilization

43.9%
0%25%50%75%100%

Spent

₹275 Cr

Remaining

₹351 Cr

Total

₹626 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

14/11/2027

Revised Completion

14/11/2027

Completed

Project Details

Project Code618404
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateArunachal Pradesh
Data Month2026-08

Financial Summary

Original Cost₹626 Cr
Revised Cost₹626 Cr
Expenditure₹275 Cr
Original End Date14/11/2027
Revised Date14/11/2027

Project Intelligence

Project is within original budget of ₹626 Cr — no cost escalation recorded.

Expenditure stands at ₹275 Cr, which is 43.9% of the revised project cost.

Remaining budget: ₹351 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of lntermediate Lane Road with hard shoulder from design chainage Km 0.000 to Km 53.040 Existing Length68.500 Km & Total Design length 53.04 km of Tato to Monigong section of NH-913 Frontier Highway on Nafra Bomdila to Vijaynagar along China border in state of Arunachal pradesh on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹626.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of lntermediate Lane Road with hard shoulder from design chainage K"?
Construction of lntermediate Lane Road with hard shoulder from design chainage Km 0.000 to Km 53.040 Existing Length68.500 Km & Total Design length 53.04 km of Tato to Monigong section of NH-913 Frontier Highway on Nafra Bomdila to Vijaynagar along China border in state of Arunachal pradesh on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Arunachal Pradesh. Original cost: ₹626 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹626 Cr has not been significantly revised. Expenditure: ₹275 Cr (43.9% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of lntermediate Lane Road with hard shoulder fr is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618404. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of lntermediate Lane Road with hard shoulder fr is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.