Roads & HighwaysIPM · Central Project#618129

Construction of Kasrawad bypass, Selani bypass, Khargone bypass & Bistan bypass Total length. 31.950 km Section of NH-347 C to Two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC mode.

Ministry of Road Transport & HighwaysMadhya Pradesh
Revised Cost: ₹468 CrUtilization: 57.6%

Original Cost

₹468 Cr

Baseline estimate

On budget

Revised Cost

₹468 Cr

Latest approved cost

Expenditure

₹270 Cr

Spent to date

Utilization

57.6%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹198 Cr

Budget left

Budget Utilization

57.6%
0%25%50%75%100%

Spent

₹270 Cr

Remaining

₹198 Cr

Total

₹468 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/12/2026

Revised Completion

31/12/2026

Completed

Project Details

Project Code618129
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMadhya Pradesh
Data Month2026-08

Financial Summary

Original Cost₹468 Cr
Revised Cost₹468 Cr
Expenditure₹270 Cr
Original End Date31/12/2026
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹468 Cr — no cost escalation recorded.

Expenditure stands at ₹270 Cr, which is 57.6% of the revised project cost.

Remaining budget: ₹198 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of Kasrawad bypass, Selani bypass, Khargone bypass & Bistan bypass Total length. 31.950 km Section of NH-347 C to Two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹468.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of Kasrawad bypass, Selani bypass, Khargone bypass & Bistan bypass "?
Construction of Kasrawad bypass, Selani bypass, Khargone bypass & Bistan bypass Total length. 31.950 km Section of NH-347 C to Two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹468 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹468 Cr has not been significantly revised. Expenditure: ₹270 Cr (57.6% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of Kasrawad bypass, Selani bypass, Khargone byp is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618129. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Kasrawad bypass, Selani bypass, Khargone byp is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.