Construction of Kaithi-Padaria Kala bypass, Patna-Tamoli bypass, Jaso bypass and Nagod bypass total length 15.44 Km to 2-lane with paved shoulders flexible pavement on NH-943 in the State of Madhya Pradesh on EPC Mode.
Original Cost
₹158 Cr
Baseline estimate
Revised Cost
₹158 Cr
Latest approved cost
Expenditure
₹63 Cr
Spent to date
Utilization
39.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹95 Cr
Budget left
Budget Utilization
39.9%Spent
₹63 Cr
Remaining
₹95 Cr
Total
₹158 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
06/10/2025
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹158 Cr — no cost escalation recorded.
Expenditure stands at ₹63 Cr, which is 39.9% of the revised project cost.
Remaining budget: ₹95 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Kaithi-Padaria Kala bypass, Patna-Tamoli bypass, Jaso bypass and Nagod bypass total length 15.44 Km to 2-lane with paved shoulders flexible pavement on NH-943 in the State of Madhya Pradesh on EPC Mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹158.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Kaithi-Padaria Kala bypass, Patna-Tamoli bypass, Jaso bypass and"?
- Construction of Kaithi-Padaria Kala bypass, Patna-Tamoli bypass, Jaso bypass and Nagod bypass total length 15.44 Km to 2-lane with paved shoulders flexible pavement on NH-943 in the State of Madhya Pradesh on EPC Mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹158 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹158 Cr has not been significantly revised. Expenditure: ₹63 Cr (39.9% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Kaithi-Padaria Kala bypass, Patna-Tamoli byp is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618068. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Kaithi-Padaria Kala bypass, Patna-Tamoli byp is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.