Construction of four lane highway with paved shoulder from Km.74.700 to Km.112.950 of NH-731A i/c Yamuna Bridge on HAM in the state of Uttar Pradesh.
Original Cost
₹1142 Cr
Baseline estimate
Revised Cost
₹1157 Cr
Latest approved cost
Expenditure
₹628 Cr
Spent to date
Utilization
54.2%
Of revised budget
Cost Status
+1.3%
+₹15 Cr increase
Remaining
₹529 Cr
Budget left
Budget Utilization
54.2%Spent
₹628 Cr
Remaining
₹529 Cr
Total
₹1157 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1142 Cr
Revised Cost
₹1157 Cr
Increase
+₹15 Cr
Escalation
+1.3%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
23/06/2026
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹15 Cr (1.3%) from the original estimate of ₹1142 Cr.
Expenditure stands at ₹628 Cr, which is 54.2% of the revised project cost.
Remaining budget: ₹529 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of four lane highway with paved shoulder from Km.74.700 to Km.112.950 of NH-731A i/c Yamuna Bridge on HAM in the state of Uttar Pradesh. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1142.00 Cr, later revised to ₹1157.31 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of four lane highway with paved shoulder from Km.74.700 to Km.112.9"?
- Construction of four lane highway with paved shoulder from Km.74.700 to Km.112.950 of NH-731A i/c Yamuna Bridge on HAM in the state of Uttar Pradesh. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹1142 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1142 Cr and has been revised to ₹1157 Cr — a cost overrun of +1.3%. Expenditure to date: ₹628 Cr (54.2% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of four lane highway with paved shoulder from K is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618164. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of four lane highway with paved shoulder from K is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.