Construction of Four Lane Highway from Ghazipur- Ballia-UP/Bihar State Border Greenfield section of NH-31 Package III [from Pindari km 78.150 to Rawalganj Bypass Km 117.120] on EPC Mode in the state of Uttar Pradesh.
Original Cost
₹1494 Cr
Baseline estimate
Revised Cost
₹1494 Cr
Latest approved cost
Expenditure
₹1065 Cr
Spent to date
Utilization
71.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹429 Cr
Budget left
Budget Utilization
71.3%Spent
₹1065 Cr
Remaining
₹429 Cr
Total
₹1494 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
28/08/2025
Revised Completion
30/11/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1494 Cr — no cost escalation recorded.
Expenditure stands at ₹1065 Cr, which is 71.3% of the revised project cost.
Remaining budget: ₹429 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Four Lane Highway from Ghazipur- Ballia-UP/Bihar State Border Greenfield section of NH-31 Package III [from Pindari km 78.150 to Rawalganj Bypass Km 117.120] on EPC Mode in the state of Uttar Pradesh. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1494.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Four Lane Highway from Ghazipur- Ballia-UP/Bihar State Border Gr"?
- Construction of Four Lane Highway from Ghazipur- Ballia-UP/Bihar State Border Greenfield section of NH-31 Package III [from Pindari km 78.150 to Rawalganj Bypass Km 117.120] on EPC Mode in the state of Uttar Pradesh. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹1494 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1494 Cr has not been significantly revised. Expenditure: ₹1065 Cr (71.3% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Four Lane Highway from Ghazipur- Ballia-UP/B is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619154. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Four Lane Highway from Ghazipur- Ballia-UP/B is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.