Construction of Four lane Elevated Structure at Raniwada Circle in Sanchore City on NH-68
Original Cost
₹353 Cr
Baseline estimate
Revised Cost
₹241 Cr
Latest approved cost
Expenditure
₹200 Cr
Spent to date
Utilization
82.8%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹42 Cr
Budget left
Budget Utilization
82.8%Spent
₹200 Cr
Remaining
₹42 Cr
Total
₹241 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
11/07/2026
Revised Completion
22/11/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹353 Cr — no cost escalation recorded.
Expenditure stands at ₹200 Cr, which is 82.8% of the revised project cost.
Remaining budget: ₹42 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Four lane Elevated Structure at Raniwada Circle in Sanchore City on NH-68 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹353.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Four lane Elevated Structure at Raniwada Circle in Sanchore City"?
- Construction of Four lane Elevated Structure at Raniwada Circle in Sanchore City on NH-68 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Rajasthan. Original cost: ₹353 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹353 Cr and has been revised to ₹241 Cr — a cost overrun of -31.6%. Expenditure to date: ₹200 Cr (82.8% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Four lane Elevated Structure at Raniwada Cir is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618853. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Four lane Elevated Structure at Raniwada Cir is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.