Construction of Elevated corridor from Km. 135.650 to 136.300 on 63, from Km. 249 to Km. 250.050 on old NH-4 and from Km. 192.910 to Km. 193.350 on NH-218 from decongestion of traffic in Ranichennamma circle in Hubli city in the state of Karnataka on EPC basis
Original Cost
₹298 Cr
Baseline estimate
Revised Cost
₹349 Cr
Latest approved cost
Expenditure
₹262 Cr
Spent to date
Utilization
75.0%
Of revised budget
Cost Status
+17.3%
+₹51 Cr increase
Remaining
₹87 Cr
Budget left
Budget Utilization
75.0%Spent
₹262 Cr
Remaining
₹87 Cr
Total
₹349 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹298 Cr
Revised Cost
₹349 Cr
Increase
+₹51 Cr
Escalation
+17.3%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
04/06/2024
Revised Completion
30/11/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹51 Cr (17.3%) from the original estimate of ₹298 Cr.
Expenditure stands at ₹262 Cr, which is 75.0% of the revised project cost.
Remaining budget: ₹87 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Elevated corridor from Km. 135.650 to 136.300 on 63, from Km. 249 to Km. 250.050 on old NH-4 and from Km. 192.910 to Km. 193.350 on NH-218 from decongestion of traffic in Ranichennamma circle in Hubli city in the state of Karnataka on EPC basis is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹298.00 Cr, later revised to ₹349.49 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Elevated corridor from Km. 135.650 to 136.300 on 63, from Km. 24"?
- Construction of Elevated corridor from Km. 135.650 to 136.300 on 63, from Km. 249 to Km. 250.050 on old NH-4 and from Km. 192.910 to Km. 193.350 on NH-218 from decongestion of traffic in Ranichennamma circle in Hubli city in the state of Karnataka on EPC basis is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹298 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹298 Cr and has been revised to ₹349 Cr — a cost overrun of +17.3%. Expenditure to date: ₹262 Cr (75.0% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Elevated corridor from Km. 135.650 to 136.30 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617935. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Elevated corridor from Km. 135.650 to 136.30 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.