Construction of Chintamani Bypass from Design Ch.0000 Existing Ch.428880 to Design Ch.15400 Existing Ch.444010 on NH-69 in the State of Karnataka in EPC Mode under NHO Annual Plan 2022-23. NH-69-KNT-2022-23-989 dated 24.03.2023
Original Cost
₹315 Cr
Baseline estimate
Revised Cost
₹315 Cr
Latest approved cost
Expenditure
₹66 Cr
Spent to date
Utilization
20.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹249 Cr
Budget left
Budget Utilization
20.9%Spent
₹66 Cr
Remaining
₹249 Cr
Total
₹315 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
18/07/2027
Revised Completion
18/07/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹315 Cr — no cost escalation recorded.
Expenditure stands at ₹66 Cr, which is 20.9% of the revised project cost.
Remaining budget: ₹249 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Chintamani Bypass from Design Ch.0000 Existing Ch.428880 to Design Ch.15400 Existing Ch.444010 on NH-69 in the State of Karnataka in EPC Mode under NHO Annual Plan 2022-23. NH-69-KNT-2022-23-989 dated 24.03.2023 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹315.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Chintamani Bypass from Design Ch.0000 Existing Ch.428880 to Desi"?
- Construction of Chintamani Bypass from Design Ch.0000 Existing Ch.428880 to Design Ch.15400 Existing Ch.444010 on NH-69 in the State of Karnataka in EPC Mode under NHO Annual Plan 2022-23. NH-69-KNT-2022-23-989 dated 24.03.2023 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹315 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹315 Cr has not been significantly revised. Expenditure: ₹66 Cr (20.9% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Chintamani Bypass from Design Ch.0000 Existi is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617951. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Chintamani Bypass from Design Ch.0000 Existi is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.