Construction of Bypass to Madurai Achambathu Viratipathu in between km 6/850 10/382 of NH 49 Extn New NH 85 including Land Acquisition on Engineering, Procurement & Construction EPC basis Contract under NH O Annual Plan 2021-22 in the state of Tamil Nadu job No.NH-49 Extn New NH 85 - TN-2021-22-997
Original Cost
₹239 Cr
Baseline estimate
Revised Cost
₹260 Cr
Latest approved cost
Expenditure
₹217 Cr
Spent to date
Utilization
83.6%
Of revised budget
Cost Status
+8.8%
+₹21 Cr increase
Remaining
₹43 Cr
Budget left
Budget Utilization
83.6%Spent
₹217 Cr
Remaining
₹43 Cr
Total
₹260 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹239 Cr
Revised Cost
₹260 Cr
Increase
+₹21 Cr
Escalation
+8.8%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
23/08/2026
Revised Completion
31/10/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹21 Cr (8.8%) from the original estimate of ₹239 Cr.
Expenditure stands at ₹217 Cr, which is 83.6% of the revised project cost.
Remaining budget: ₹43 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Bypass to Madurai Achambathu Viratipathu in between km 6/850 10/382 of NH 49 Extn New NH 85 including Land Acquisition on Engineering, Procurement & Construction EPC basis Contract under NH O Annual Plan 2021-22 in the state of Tamil Nadu job No.NH-49 Extn New NH 85 - TN-2021-22-997 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹239.00 Cr, later revised to ₹260.07 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Bypass to Madurai Achambathu Viratipathu in between km 6/850 "?
- Construction of Bypass to Madurai Achambathu Viratipathu in between km 6/850 10/382 of NH 49 Extn New NH 85 including Land Acquisition on Engineering, Procurement & Construction EPC basis Contract under NH O Annual Plan 2021-22 in the state of Tamil Nadu job No.NH-49 Extn New NH 85 - TN-2021-22-997 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Tamil Nadu. Original cost: ₹239 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹239 Cr and has been revised to ₹260 Cr — a cost overrun of +8.8%. Expenditure to date: ₹217 Cr (83.6% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Bypass to Madurai Achambathu Viratipathu i is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617962. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Bypass to Madurai Achambathu Viratipathu i is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.