Construction of Bhabhua Bypass from Ch. 10800Design Ch. 10800 to Ch. 19860 Design Ch. 18150 and Chand Bypass from Ch. 38060 Design Ch. 36250 to Ch. 40460 Design Ch. 38650 and widening of existing road to 2 - lane with Paved shoulder from Ch. 40460 Design Ch. 38650 to Ch. 46860 Design Ch. 45050 of NH-219 Total length-16.150 Kmunder EPC mode in the state of Bihar
Original Cost
₹180 Cr
Baseline estimate
Revised Cost
₹180 Cr
Latest approved cost
Expenditure
₹31 Cr
Spent to date
Utilization
17.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹149 Cr
Budget left
Budget Utilization
17.0%Spent
₹31 Cr
Remaining
₹149 Cr
Total
₹180 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
02/12/2027
Revised Completion
02/12/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹180 Cr — no cost escalation recorded.
Expenditure stands at ₹31 Cr, which is 17.0% of the revised project cost.
Remaining budget: ₹149 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Bhabhua Bypass from Ch. 10800Design Ch. 10800 to Ch. 19860 Design Ch. 18150 and Chand Bypass from Ch. 38060 Design Ch. 36250 to Ch. 40460 Design Ch. 38650 and widening of existing road to 2 - lane with Paved shoulder from Ch. 40460 Design Ch. 38650 to Ch. 46860 Design Ch. 45050 of NH-219 Total length-16.150 Kmunder EPC mode in the state of Bihar is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹180.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Bhabhua Bypass from Ch. 10800Design Ch. 10800 to Ch. 19860 Desig"?
- Construction of Bhabhua Bypass from Ch. 10800Design Ch. 10800 to Ch. 19860 Design Ch. 18150 and Chand Bypass from Ch. 38060 Design Ch. 36250 to Ch. 40460 Design Ch. 38650 and widening of existing road to 2 - lane with Paved shoulder from Ch. 40460 Design Ch. 38650 to Ch. 46860 Design Ch. 45050 of NH-219 Total length-16.150 Kmunder EPC mode in the state of Bihar is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Bihar. Original cost: ₹180 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹180 Cr has not been significantly revised. Expenditure: ₹31 Cr (17.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Bhabhua Bypass from Ch. 10800Design Ch. 1080 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618004. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Bhabhua Bypass from Ch. 10800Design Ch. 1080 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.