Construction of Ater realignment & Bhind bypass Total length. 21.50 km Section of NH-552Extn. to Two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC mode.
Original Cost
₹348 Cr
Baseline estimate
Revised Cost
₹348 Cr
Latest approved cost
Expenditure
₹104 Cr
Spent to date
Utilization
29.8%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹244 Cr
Budget left
Budget Utilization
29.8%Spent
₹104 Cr
Remaining
₹244 Cr
Total
₹348 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
09/06/2026
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹348 Cr — no cost escalation recorded.
Expenditure stands at ₹104 Cr, which is 29.8% of the revised project cost.
Remaining budget: ₹244 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of Ater realignment & Bhind bypass Total length. 21.50 km Section of NH-552Extn. to Two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹348.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of Ater realignment & Bhind bypass Total length. 21.50 km Section o"?
- Construction of Ater realignment & Bhind bypass Total length. 21.50 km Section of NH-552Extn. to Two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹348 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹348 Cr has not been significantly revised. Expenditure: ₹104 Cr (29.8% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of Ater realignment & Bhind bypass Total length is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618157. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of Ater realignment & Bhind bypass Total length is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.