Construction of additional major Bridge with 4- lane configuration of length 1.48 km on NH-60 NH-14 over River Kangshabati from Km. 117.770 to Km 119.250 and additional major Bridge with 4- lane configuration of length 0.900 km on NH-60 NH-14 over River Shilabati from Km. 173.220 to Km 174.120 in the district of Paschim Medinipur of West Bengal under Annual Plan for FY 2023-24 on EPC mode. Job No 014-W8-2023-24/527 .
Original Cost
₹305 Cr
Baseline estimate
Revised Cost
₹305 Cr
Latest approved cost
Expenditure
₹1 Cr
Spent to date
Utilization
0.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹304 Cr
Budget left
Budget Utilization
0.3%Spent
₹1 Cr
Remaining
₹304 Cr
Total
₹305 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
15/05/2028
Revised Completion
15/05/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹305 Cr — no cost escalation recorded.
Expenditure stands at ₹1 Cr, which is 0.3% of the revised project cost.
Remaining budget: ₹304 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of additional major Bridge with 4- lane configuration of length 1.48 km on NH-60 NH-14 over River Kangshabati from Km. 117.770 to Km 119.250 and additional major Bridge with 4- lane configuration of length 0.900 km on NH-60 NH-14 over River Shilabati from Km. 173.220 to Km 174.120 in the district of Paschim Medinipur of West Bengal under Annual Plan for FY 2023-24 on EPC mode. Job No 014-W8-2023-24/527 . is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹305.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of additional major Bridge with 4- lane configuration of length 1.4"?
- Construction of additional major Bridge with 4- lane configuration of length 1.48 km on NH-60 NH-14 over River Kangshabati from Km. 117.770 to Km 119.250 and additional major Bridge with 4- lane configuration of length 0.900 km on NH-60 NH-14 over River Shilabati from Km. 173.220 to Km 174.120 in the district of Paschim Medinipur of West Bengal under Annual Plan for FY 2023-24 on EPC mode. Job No 014-W8-2023-24/527 . is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: West Bengal. Original cost: ₹305 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹305 Cr has not been significantly revised. Expenditure: ₹1 Cr (0.3% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of additional major Bridge with 4- lane configu is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617893. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of additional major Bridge with 4- lane configu is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.