Roads & HighwaysIPM · Central Project#618882

Construction of additional 3-Lane Bridge over River Ganga for connection between Buxar and Bharauli on NH-922 in the State of Uttar Pradesh and Bihar on Hybrid Annuity Mode

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹445 CrUtilization: 10.7%

Original Cost

₹532 Cr

Baseline estimate

On budget

Revised Cost

₹445 Cr

Latest approved cost

Expenditure

₹47 Cr

Spent to date

Utilization

10.7%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹398 Cr

Budget left

Budget Utilization

10.7%
0%25%50%75%100%

Spent

₹47 Cr

Remaining

₹398 Cr

Total

₹445 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

19/02/2028

Revised Completion

19/02/2028

Completed

Project Details

Project Code618882
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹532 Cr
Revised Cost₹445 Cr
Expenditure₹47 Cr
Original End Date19/02/2028
Revised Date19/02/2028

Project Intelligence

Project is within original budget of ₹532 Cr — no cost escalation recorded.

Expenditure stands at ₹47 Cr, which is 10.7% of the revised project cost.

Remaining budget: ₹398 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of additional 3-Lane Bridge over River Ganga for connection between Buxar and Bharauli on NH-922 in the State of Uttar Pradesh and Bihar on Hybrid Annuity Mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹532.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of additional 3-Lane Bridge over River Ganga for connection between"?
Construction of additional 3-Lane Bridge over River Ganga for connection between Buxar and Bharauli on NH-922 in the State of Uttar Pradesh and Bihar on Hybrid Annuity Mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹532 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹532 Cr and has been revised to ₹445 Cr — a cost overrun of -16.4%. Expenditure to date: ₹47 Cr (10.7% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of additional 3-Lane Bridge over River Ganga fo is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618882. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of additional 3-Lane Bridge over River Ganga fo is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.