Construction of 7 Nos of Standalone safety structures/works at different locations on various NHs
Original Cost
₹169 Cr
Baseline estimate
Revised Cost
₹112 Cr
Latest approved cost
Expenditure
₹38 Cr
Spent to date
Utilization
34.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹74 Cr
Budget left
Budget Utilization
34.2%Spent
₹38 Cr
Remaining
₹74 Cr
Total
₹112 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
27/01/2027
Revised Completion
20/01/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹169 Cr — no cost escalation recorded.
Expenditure stands at ₹38 Cr, which is 34.2% of the revised project cost.
Remaining budget: ₹74 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 7 Nos of Standalone safety structures/works at different locations on various NHs is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹169.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 7 Nos of Standalone safety structures/works at different locatio"?
- Construction of 7 Nos of Standalone safety structures/works at different locations on various NHs is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹169 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹169 Cr and has been revised to ₹112 Cr — a cost overrun of -33.7%. Expenditure to date: ₹38 Cr (34.2% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 7 Nos of Standalone safety structures/works is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618627. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 7 Nos of Standalone safety structures/works is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.