Construction of 6 lane flyover from Khapari ROB to Mihan Interchange design chainage km 8760 to 11450 L- 2.69 km and upgradation of existing 4L PS road to 6LPS with service road by flexible pavement design chainage km 11450 to 14500 L-3.05 [total project length 5.74 km] in section of Nagpur - Hyderabad NH-44 Old NH-7 in Nagpur district in the state of Maharashtra on HAM mode.
Original Cost
₹620 Cr
Baseline estimate
Revised Cost
₹620 Cr
Latest approved cost
Expenditure
₹23 Cr
Spent to date
Utilization
3.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹597 Cr
Budget left
Budget Utilization
3.7%Spent
₹23 Cr
Remaining
₹597 Cr
Total
₹620 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
03/10/2027
Revised Completion
02/10/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹620 Cr — no cost escalation recorded.
Expenditure stands at ₹23 Cr, which is 3.7% of the revised project cost.
Remaining budget: ₹597 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 6 lane flyover from Khapari ROB to Mihan Interchange design chainage km 8760 to 11450 L- 2.69 km and upgradation of existing 4L PS road to 6LPS with service road by flexible pavement design chainage km 11450 to 14500 L-3.05 [total project length 5.74 km] in section of Nagpur - Hyderabad NH-44 Old NH-7 in Nagpur district in the state of Maharashtra on HAM mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹620.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 6 lane flyover from Khapari ROB to Mihan Interchange design chai"?
- Construction of 6 lane flyover from Khapari ROB to Mihan Interchange design chainage km 8760 to 11450 L- 2.69 km and upgradation of existing 4L PS road to 6LPS with service road by flexible pavement design chainage km 11450 to 14500 L-3.05 [total project length 5.74 km] in section of Nagpur - Hyderabad NH-44 Old NH-7 in Nagpur district in the state of Maharashtra on HAM mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹620 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹620 Cr has not been significantly revised. Expenditure: ₹23 Cr (3.7% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 6 lane flyover from Khapari ROB to Mihan Int is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617912. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 6 lane flyover from Khapari ROB to Mihan Int is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.