Roads & HighwaysIPM · Central Project#619273

Construction of 6 lane Elevated Structure along with its approaches from Km. 142.000 to Km 144.800 Total Length 2.80 km Gondal on NH27 in the state of Gujarat

Ministry of Road Transport & HighwaysGujarat
Revised Cost: ₹262 CrUtilization: 0.0%

Original Cost

₹262 Cr

Baseline estimate

On budget

Revised Cost

₹262 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹262 Cr

Budget left

Budget Utilization

0.0%
0%25%50%75%100%

Spent

₹0 Cr

Remaining

₹262 Cr

Total

₹262 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

05/06/2028

Revised Completion

05/06/2028

Completed

Project Details

Project Code619273
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateGujarat
Data Month2026-08

Financial Summary

Original Cost₹262 Cr
Revised Cost₹262 Cr
Expenditure₹0 Cr
Original End Date05/06/2028
Revised Date05/06/2028

Project Intelligence

Project is within original budget of ₹262 Cr — no cost escalation recorded.

Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.

Remaining budget: ₹262 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 6 lane Elevated Structure along with its approaches from Km. 142.000 to Km 144.800 Total Length 2.80 km Gondal on NH27 in the state of Gujarat is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹262.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 6 lane Elevated Structure along with its approaches from Km. 142"?
Construction of 6 lane Elevated Structure along with its approaches from Km. 142.000 to Km 144.800 Total Length 2.80 km Gondal on NH27 in the state of Gujarat is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Gujarat. Original cost: ₹262 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹262 Cr has not been significantly revised. Expenditure: ₹0 Cr (0.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 6 lane Elevated Structure along with its app is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619273. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 6 lane Elevated Structure along with its app is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.