Roads & HighwaysIPM · Central Project#618250

Construction of 6-Lane Elevated / Extra Dose Cable Bridge on River Ganga parallel to & Western side of Digha-Sonepur Rail cum-Road Bridge of NH 139W in the State of Bihar

Ministry of Road Transport & HighwaysBihar
Revised Cost: ₹3064 CrUtilization: 13.3%

Original Cost

₹3064 Cr

Baseline estimate

On budget

Revised Cost

₹3064 Cr

Latest approved cost

Expenditure

₹408 Cr

Spent to date

Utilization

13.3%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹2656 Cr

Budget left

Budget Utilization

13.3%
0%25%50%75%100%

Spent

₹408 Cr

Remaining

₹2656 Cr

Total

₹3064 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

02/11/2027

Revised Completion

30/12/2028

Completed

Project Details

Project Code618250
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateBihar
Data Month2026-08

Financial Summary

Original Cost₹3064 Cr
Revised Cost₹3064 Cr
Expenditure₹408 Cr
Original End Date02/11/2027
Revised Date30/12/2028

Project Intelligence

Project is within original budget of ₹3064 Cr — no cost escalation recorded.

Expenditure stands at ₹408 Cr, which is 13.3% of the revised project cost.

Remaining budget: ₹2656 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 6-Lane Elevated / Extra Dose Cable Bridge on River Ganga parallel to & Western side of Digha-Sonepur Rail cum-Road Bridge of NH 139W in the State of Bihar is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹3064.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 6-Lane Elevated / Extra Dose Cable Bridge on River Ganga paralle"?
Construction of 6-Lane Elevated / Extra Dose Cable Bridge on River Ganga parallel to & Western side of Digha-Sonepur Rail cum-Road Bridge of NH 139W in the State of Bihar is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Bihar. Original cost: ₹3064 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹3064 Cr has not been significantly revised. Expenditure: ₹408 Cr (13.3% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 6-Lane Elevated / Extra Dose Cable Bridge on is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618250. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 6-Lane Elevated / Extra Dose Cable Bridge on is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.