Construction of 6 lane elevated corridor including its approaches from Km. 629880 to Km. 634470 Design Chainage of NH-16 in Ranasthalam Town portion in the state of Andhra Pradesh on EPC Mode under NHO.
Original Cost
₹258 Cr
Baseline estimate
Revised Cost
₹193 Cr
Latest approved cost
Expenditure
₹62 Cr
Spent to date
Utilization
32.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹131 Cr
Budget left
Budget Utilization
32.0%Spent
₹62 Cr
Remaining
₹131 Cr
Total
₹193 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
20/03/2027
Revised Completion
31/08/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹258 Cr — no cost escalation recorded.
Expenditure stands at ₹62 Cr, which is 32.0% of the revised project cost.
Remaining budget: ₹131 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 6 lane elevated corridor including its approaches from Km. 629880 to Km. 634470 Design Chainage of NH-16 in Ranasthalam Town portion in the state of Andhra Pradesh on EPC Mode under NHO. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹258.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 6 lane elevated corridor including its approaches from Km. 62988"?
- Construction of 6 lane elevated corridor including its approaches from Km. 629880 to Km. 634470 Design Chainage of NH-16 in Ranasthalam Town portion in the state of Andhra Pradesh on EPC Mode under NHO. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹258 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹258 Cr and has been revised to ₹193 Cr — a cost overrun of -25.3%. Expenditure to date: ₹62 Cr (32.0% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 6 lane elevated corridor including its appro is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618524. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 6 lane elevated corridor including its appro is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.