Construction of 6 Lane Elevated corridor from KM 612582 to KM 617540 including construction of Service Roads in Kolhapur City on NH -48 in the State of Maharashtra on EPC mode under NHO
Original Cost
₹1039 Cr
Baseline estimate
Revised Cost
₹1039 Cr
Latest approved cost
Expenditure
₹0 Cr
Spent to date
Utilization
0.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1039 Cr
Budget left
Budget Utilization
0.0%Spent
₹0 Cr
Remaining
₹1039 Cr
Total
₹1039 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
08/06/2029
Revised Completion
08/06/2029
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1039 Cr — no cost escalation recorded.
Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.
Remaining budget: ₹1039 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 6 Lane Elevated corridor from KM 612582 to KM 617540 including construction of Service Roads in Kolhapur City on NH -48 in the State of Maharashtra on EPC mode under NHO is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1039.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 6 Lane Elevated corridor from KM 612582 to KM 617540 including c"?
- Construction of 6 Lane Elevated corridor from KM 612582 to KM 617540 including construction of Service Roads in Kolhapur City on NH -48 in the State of Maharashtra on EPC mode under NHO is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹1039 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹1039 Cr has not been significantly revised. Expenditure: ₹0 Cr (0.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 6 Lane Elevated corridor from KM 612582 to K is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619298. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 6 Lane Elevated corridor from KM 612582 to K is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.