Construction of 4/6 Laning from Km 132.375 to Km 153.058 Total New Alignment length of 20.683 Km of Daboka-Dimapur Section Dimapur Bypass Nagaland Portion of NH-36 & 39 in the State of Nagaland on EPC basis under PhaseA of SARDP-NE
Original Cost
₹819 Cr
Baseline estimate
Revised Cost
₹819 Cr
Latest approved cost
Expenditure
₹0 Cr
Spent to date
Utilization
0.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹819 Cr
Budget left
Budget Utilization
0.0%Spent
₹0 Cr
Remaining
₹819 Cr
Total
₹819 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
04/09/2020
Revised Completion
28/02/2023
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹819 Cr — no cost escalation recorded.
Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.
Remaining budget: ₹819 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 4/6 Laning from Km 132.375 to Km 153.058 Total New Alignment length of 20.683 Km of Daboka-Dimapur Section Dimapur Bypass Nagaland Portion of NH-36 & 39 in the State of Nagaland on EPC basis under PhaseA of SARDP-NE is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹819.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 4/6 Laning from Km 132.375 to Km 153.058 Total New Alignment len"?
- Construction of 4/6 Laning from Km 132.375 to Km 153.058 Total New Alignment length of 20.683 Km of Daboka-Dimapur Section Dimapur Bypass Nagaland Portion of NH-36 & 39 in the State of Nagaland on EPC basis under PhaseA of SARDP-NE is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Nagaland. Original cost: ₹819 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹819 Cr has not been significantly revised. Expenditure: ₹0 Cr (N/A% of cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Construction of 4/6 Laning from Km 132.375 to Km 153.058 Tot is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618329. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4/6 Laning from Km 132.375 to Km 153.058 Tot is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.