Roads & HighwaysIPM · Central Project#618321

Construction of 4-Laning of West Serawlg-Sairang section of NH-6 from Existing Chainage km 142000 to km 158900 Design Chainage km 123400 to km 136260 on Silchar - Vairengte - Sairang road in the State of Mizoram under Bharatmala Pariyojna on EPC mode under NHO-NE Package-8

Ministry of Road Transport & HighwaysMizoram
Revised Cost: ₹876 CrUtilization: 33.0%

Original Cost

₹876 Cr

Baseline estimate

On budget

Revised Cost

₹876 Cr

Latest approved cost

Expenditure

₹289 Cr

Spent to date

Utilization

33.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹587 Cr

Budget left

Budget Utilization

33.0%
0%25%50%75%100%

Spent

₹289 Cr

Remaining

₹587 Cr

Total

₹876 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

01/11/2028

Revised Completion

Completed

Project Details

Project Code618321
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMizoram
Data Month2026-08

Financial Summary

Original Cost₹876 Cr
Revised Cost₹876 Cr
Expenditure₹289 Cr
Original End Date01/11/2028
Revised DateN/A

Project Intelligence

Project is within original budget of ₹876 Cr — no cost escalation recorded.

Expenditure stands at ₹289 Cr, which is 33.0% of the revised project cost.

Remaining budget: ₹587 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 4-Laning of West Serawlg-Sairang section of NH-6 from Existing Chainage km 142000 to km 158900 Design Chainage km 123400 to km 136260 on Silchar - Vairengte - Sairang road in the State of Mizoram under Bharatmala Pariyojna on EPC mode under NHO-NE Package-8 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹876.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 4-Laning of West Serawlg-Sairang section of NH-6 from Existing "?
Construction of 4-Laning of West Serawlg-Sairang section of NH-6 from Existing Chainage km 142000 to km 158900 Design Chainage km 123400 to km 136260 on Silchar - Vairengte - Sairang road in the State of Mizoram under Bharatmala Pariyojna on EPC mode under NHO-NE Package-8 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹876 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹876 Cr has not been significantly revised. Expenditure: ₹289 Cr (33.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 4-Laning of West Serawlg-Sairang section of is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618321. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4-Laning of West Serawlg-Sairang section of is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.