Construction of 4-Laning of West Serawlg-Sairang section of NH-6 from Existing Chainage km 142000 to km 158900 Design Chainage km 123400 to km 136260 on Silchar - Vairengte - Sairang road in the State of Mizoram under Bharatmala Pariyojna on EPC mode under NHO-NE Package-8
Original Cost
₹876 Cr
Baseline estimate
Revised Cost
₹876 Cr
Latest approved cost
Expenditure
₹289 Cr
Spent to date
Utilization
33.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹587 Cr
Budget left
Budget Utilization
33.0%Spent
₹289 Cr
Remaining
₹587 Cr
Total
₹876 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
01/11/2028
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹876 Cr — no cost escalation recorded.
Expenditure stands at ₹289 Cr, which is 33.0% of the revised project cost.
Remaining budget: ₹587 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 4-Laning of West Serawlg-Sairang section of NH-6 from Existing Chainage km 142000 to km 158900 Design Chainage km 123400 to km 136260 on Silchar - Vairengte - Sairang road in the State of Mizoram under Bharatmala Pariyojna on EPC mode under NHO-NE Package-8 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹876.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 4-Laning of West Serawlg-Sairang section of NH-6 from Existing "?
- Construction of 4-Laning of West Serawlg-Sairang section of NH-6 from Existing Chainage km 142000 to km 158900 Design Chainage km 123400 to km 136260 on Silchar - Vairengte - Sairang road in the State of Mizoram under Bharatmala Pariyojna on EPC mode under NHO-NE Package-8 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Mizoram. Original cost: ₹876 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹876 Cr has not been significantly revised. Expenditure: ₹289 Cr (33.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 4-Laning of West Serawlg-Sairang section of is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618321. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4-Laning of West Serawlg-Sairang section of is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.