Roads & HighwaysIPM · Central Project#619061

Construction of 4 lane with PS Idar-Badoli bypass section from design km 81/300 to km 95/500 of NH 168G in the State of Gujarat

Ministry of Road Transport & HighwaysGujarat
Revised Cost: ₹705 CrUtilization: 13.1%

Original Cost

₹705 Cr

Baseline estimate

On budget

Revised Cost

₹705 Cr

Latest approved cost

Expenditure

₹92 Cr

Spent to date

Utilization

13.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹613 Cr

Budget left

Budget Utilization

13.1%
0%25%50%75%100%

Spent

₹92 Cr

Remaining

₹613 Cr

Total

₹705 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

06/05/2028

Revised Completion

06/05/2028

Completed

Project Details

Project Code619061
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateGujarat
Data Month2026-08

Financial Summary

Original Cost₹705 Cr
Revised Cost₹705 Cr
Expenditure₹92 Cr
Original End Date06/05/2028
Revised Date06/05/2028

Project Intelligence

Project is within original budget of ₹705 Cr — no cost escalation recorded.

Expenditure stands at ₹92 Cr, which is 13.1% of the revised project cost.

Remaining budget: ₹613 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 4 lane with PS Idar-Badoli bypass section from design km 81/300 to km 95/500 of NH 168G in the State of Gujarat is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹705.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 4 lane with PS Idar-Badoli bypass section from design km 81/300 "?
Construction of 4 lane with PS Idar-Badoli bypass section from design km 81/300 to km 95/500 of NH 168G in the State of Gujarat is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Gujarat. Original cost: ₹705 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹705 Cr has not been significantly revised. Expenditure: ₹92 Cr (13.1% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 4 lane with PS Idar-Badoli bypass section fr is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619061. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4 lane with PS Idar-Badoli bypass section fr is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.