Construction of 4 lane with paved shoulder Pattan bypass Greenfield bypass from existing Ch. Km 24320 to Km 33760 and Design Ch. from Km 24400 to Km 35300, total length 10.900 km on road SrinagarBaramulla Uri NH-01 in the UT of Jammu & Kashmir under Project BEACON, Border Roads Organization BRO on EPC mode. Package-II

Ministry of Road Transport & HighwaysJammu & Kashmir
Revised Cost: ₹980 CrUtilization: 54.9%

Original Cost

₹980 Cr

Baseline estimate

On budget

Revised Cost

₹980 Cr

Latest approved cost

Expenditure

₹538 Cr

Spent to date

Utilization

54.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹442 Cr

Budget left

Budget Utilization

54.9%
0%25%50%75%100%

Spent

₹538 Cr

Remaining

₹442 Cr

Total

₹980 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/07/2026

Revised Completion

28/02/2027

Completed

Project Details

Project Code618203
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateJammu & Kashmir
Data Month2026-08

Financial Summary

Original Cost₹980 Cr
Revised Cost₹980 Cr
Expenditure₹538 Cr
Original End Date31/07/2026
Revised Date28/02/2027

Project Intelligence

Project is within original budget of ₹980 Cr — no cost escalation recorded.

Expenditure stands at ₹538 Cr, which is 54.9% of the revised project cost.

Remaining budget: ₹442 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 4 lane with paved shoulder Pattan bypass Greenfield bypass from existing Ch. Km 24320 to Km 33760 and Design Ch. from Km 24400 to Km 35300, total length 10.900 km on road SrinagarBaramulla Uri NH-01 in the UT of Jammu & Kashmir under Project BEACON, Border Roads Organization BRO on EPC mode. Package-II is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹980.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 4 lane with paved shoulder Pattan bypass Greenfield bypass from "?
Construction of 4 lane with paved shoulder Pattan bypass Greenfield bypass from existing Ch. Km 24320 to Km 33760 and Design Ch. from Km 24400 to Km 35300, total length 10.900 km on road SrinagarBaramulla Uri NH-01 in the UT of Jammu & Kashmir under Project BEACON, Border Roads Organization BRO on EPC mode. Package-II is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹980 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹980 Cr has not been significantly revised. Expenditure: ₹538 Cr (54.9% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 4 lane with paved shoulder Pattan bypass Gre is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618203. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4 lane with paved shoulder Pattan bypass Gre is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.